-
Master
1,140 Answers
- Posted on Dec 15, 2010
Re: Need to change heater coil need a diagram to do so
- Drain the coolant. Refer to Draining and Filling Cooling System .
- Remove the instrument panel storage compartment.
- Disconnect the electrical connectors, as necessary.
- Remove the center floor air distribution duct.
- Remove the hinge pillar trim panels.
- Remove the blower motor cover.
- Remove the blower motor.
- Remove the steering column.
- Roll back the instrument panel. Refer to IP Carrier Replacement in Instrument Panel, Gauges and Console.
- Remove the coolant recovery reservoir.
- Remove the heater hoses.
- While holding the heater case to the cowl, remove the screw on the interior side of the cowl, near the evaporator pipe, if equipped.
- On the engine side of the cowl, remove the 4 screws that hold the heater case to the cowl.
- On the engine side of the cowl, remove the 2 nuts that hold the heater case to the cowl.
- Remove the heater case. Ask an assistant for help, if necessary.
- Remove the 7 screws that hold the heater cover to the heater case.
- Remove the heater cover.
- Remove the heater core from the retainer.
- Installing
- Install the heater core into the retainer.
- Install the 7 screws that hold the heater cover to the heater case. Replace the seals.
- Install the heater cover. Verify that the heater cover is properly sealed.
- Install the heater case. If necessary, ask an assistant for help.
- On the engine side of the cowl, install the nuts that hold the heater case to the cowl.
- On the engine side of the cowl, install the 4 screws that hold the heater case to the cowl.
- On the interior side of the cowl, install the screw.
NOTE : Refer to Fastener Notice in Cautions and Notices.
- Tighten the following fasteners:
Tighten
- Tighten the screws on the engine side of the cowl to 1.9 N.m (17 lb in) .
- Tighten the two nuts to 2.8 N.m (25 lb in) .
- Tighten the screw on the interior side of the cowl to 11 N.m (97 lb in) .
- Install the heater hoses.
- Install the coolant recovery reservoir.
- Roll forward the instrument panel. Refer to IP Carrier Replacement in Instrument Panel, Gauges and Console.
- Install the steering column.
- Install the blower motor.
- Install the blower motor cover.
- Install the hinge pillar trim panels.
- Install the center floor air distribution duct.
- Connect the electrical connectors, as necessary.
- Install the instrument panel storage compartment.
- Add the engine coolant. Refer to Draining and Filling Cooling System
- Inspect the system for leaks.
×