Primavera P6 I am newbie with Primavera P6. I am trying to find out if there is a way I can build a report that "replicate" most of the info we put in our weekly status report. What I would like to get is a list of activities (name, % completion, owner, start / end dates...) + the latest Notebook entry as "Status report" + list of open issues from the Issues tab that are associated to this activity. I believe this is what the dashboard is used for but I must confess that I am totally confused with the help online! Can you help me?

Posted by on

3 Answers

  • Level 1:

    An expert who has achieved level 1.

    Mayor:

    An expert whose answer got voted for 2 times.

  • Contributor
  • 1 Answer

I am new in P6. I have a problem that how can we add target in any project like P3? Can u please help me.

Posted on Dec 23, 2008

  • Level 1:

    An expert who has achieved level 1.

  • Contributor
  • 1 Answer

You can utilize your Primavera p6 information and export that info into an Excel spreadsheet which will then graphically represent that information per your reporting requirements.
You will need to do a couple "dry runs" to accomplish this, but the results will obviously make that time well spent.  If I can be of anymore assistance, please contact me.
By the way, the info you have adapted within your Excel spreadsheet can also be loaded into Access to further specify pure database info that will enable you to more accurately manage your data and informational input.

Posted on Apr 06, 2009

  • Level 1:

    An expert who has achieved level 1.

  • Contributor
  • 1 Answer

You can use the internal report writer within P6 to do most if not all of your reporting requirements. The only thing it fails miserably on is the ability to create good graphical reports.
You will need to have an excellent understanding of how to use the internal report writer, not the Report Wizard which is a GUI based tool to help you report.

Regards,
Manny Su
Project Systems Implementation Consultant
Http://ww.crescent-pss.com

Posted on Sep 11, 2008

1 Suggested Answer

6ya6ya
  • 2 Answers

SOURCE: I have freestanding Series 8 dishwasher. Lately during the filling cycle water hammer is occurring. How can this be resolved

Hi,
a 6ya expert can help you resolve that issue over the phone in a minute or two.
best thing about this new service is that you are never placed on hold and get to talk to real repairmen in the US.
the service is completely free and covers almost anything you can think of (from cars to computers, handyman, and even drones).
click here to download the app (for users in the US for now) and get all the help you need.
goodluck!

Posted on Jan 02, 2017

Add Your Answer

Uploading: 0%

my-video-file.mp4

Complete. Click "Add" to insert your video. Add

×

Loading...
Loading...

Related Questions:

1 Answer

I can start my Primavera P6 with OS windows 7, I use P6 stand alone. database configuration said ''Bad public user name or...


The standalone DB Configuration seems simple but can be tricky When you configure the DB you have to use a Coded Username for the AdminSuperuser permissions "admprm$pm"! this user name makes your actual Log in username "Admin" you cannot use the admprm$pm at the Log in screen. Same with the Public User Permissions "pubprm$pm" gives read permissions but log in user name is "Public" Try the "Admin/Public" usernames if this does not work you may have to Uninstall and Reinstall. If you uninstall remember there are 2 peices of software to remove... P6 and the Oracle Database 10G
Refer to: http://www.tensixconsulting.com/2013/03/primavera-p6-database-connection-configuration-details/ For further DB Config Issues.

Mar 25, 2013 | Primavera Contractor 6.1 Full Version for...

1 Answer

Im not able to instalthe primavera p6 on my new hp lap windows 7


Before installing primavera p6, check whether any SQL databases with the same name exists. Uninstall the SQL if the databases created during the previous failure installation of primavera p6(go to add or remove programs to uninstall). After uninstallation of SQL express, try to run installation files for primavera p6 will solve your problem.

Revert back for more assistance.

Dec 26, 2009 | Computers & Internet

1 Answer

P5 tutorial


i am a p3 user i want to use p6 but i dont understant how to use for that i need p6 tutorial so that i can use p6 easily

Jun 25, 2009 | Primavera Project Planner P3 (PRIMAVERAP3)...

2 Answers

Primavera financial reporting


Have you considered creating a regular export from P6 and using Access or some other reporting tool to generate your reports? I could set you something if I new the specifics of what you are trying to get.

Feb 10, 2009 | Primavera Contractor 6.1 Full Version for...

1 Answer

Importing MSP Files into P6


There is a simple solution to import mpp files into P6.

Please contact me.
Boruziniyat@gmail.com

Oct 22, 2008 | Computers & Internet

2 Answers

Primavera training in Mumbai


Primavera Course Price - 12,000.00 to 18,000.00

Jun 29, 2008 | Computers & Internet

Not finding what you are looking for?
Computers & Internet Logo

Related Topics:

1,983 people viewed this question

Ask a Question

Usually answered in minutes!

Top Primavera Computers & Internet Experts

Tom Chichester

Level 3 Expert

28963 Answers

john smith

Level 2 Expert

381 Answers

yadayada
yadayada

Level 3 Expert

67911 Answers

Are you a Primavera Computer and Internet Expert? Answer questions, earn points and help others

Answer questions

Manuals & User Guides

Loading...