Question about Ryobi Garden

Open Question

Can I measure the length of a roof ridge standing on the ground?

Posted by on

Add Your Answer

Uploading: 0%

my-video-file.mp4

Complete. Click "Add" to insert your video. Add

×

Loading...
Loading...

Related Questions:

1 Answer

Sun roof won't close 2004 Ford Explorer


The roof opening panel is an electronically operated panel that can be opened or closed by the roof opening panel switch. Actuating the switch in either a forward or rearward motion supplies a ground to the roof opening panel motor. The vent and soft-stop functions are controlled by the roof opening panel motor. These positions are obtained when an internal motor cam opens the roof position switch, removing the ground from the switch. The roof opening panel has an express open feature activated when the switch is pressed momentarily. The roof opening panel is closed by continuous activation of the switch until the sunroof stops movement. This function is controlled by the roof opening panel motor.

Visual Inspection Chart Mechanical Electrical
  • Roof opening panel
  • Opening shield
  • Roof panel frame
  • Opening shield guide feet
  • Central junction box (CJB) fuses:
    • 2 (20A)
    • 29 (5A)
  • Battery junction box (BJB) fuse 1 (60A)
  • Accessory delay relay
  • Roof opening panel control switch
  • Circuitry
  • Roof opening panel motor

  • The roof opening panel does not open or close
  • Central junction box (CJB) fuse:
    • 2 (20A).
    • 29 (5A).
  • Battery junction box (BJB) fuse 1 (60A).
  • Circuitry.
  • Roof opening panel control switch.
  • Roof opening panel motor.
  • Go To Pinpoint Test E .

Do the power windows and power locks work ?

E6 CHECK VOLTAGE TO THE ROOF OPENING PANEL MOTOR - CIRCUITS 400 (LB/BK) AND 1173 (BN/OG)
  • Key in OFF position.
  • Disconnect: Roof Opening Panel Motor C920.
  • Key in ON position.
  • NOTE: Activate accessory delay relay for this check.
  • Measure the voltage between roof opening panel motor C920-4, circuit 400 (LB/BK), and ground; and between roof opening panel motor C920-7, circuit 1173 (BN/OG), and ground.
  • Are the voltages greater than 10 volts?
Yes
GO to E7 .

No
REPAIR circuit 400 (LB/BK) or circuit 1173 (BN/OG). TEST the system for normal operation. If you can't do electrical testing , there is a manual way to close it .
Roof Opening Panel Manual Operation
  1. Remove the overhead console. For additional information, refer to Overhead Console in this section.
  1. Insert a hex-head screwdriver in the center of the manual drive slot to depress the release pin. Rotate the screwdriver clockwise until the roof opening panel is closed.

Jan 13, 2017 | 2004 Ford Explorer

1 Answer

Cannot find motor for sunroof in 1998 lincoln towncar limo


Before removing the motor ,check for B+ at the switch , in an out of the switch . Lincoln calls this a moon roof an there is a relay that powers it up . The location of relay an the motor is in the same place ,center of headliner behind the roof .
  • Sliding Roof Panel Does Not Open or Close
  • Damaged circuit breaker.
  • Circuitry open/shorted.
  • Damaged roof sliding panel switch.
  • Damaged sliding roof panel motor.
  • GO to Pinpoint Test E .
PINPOINT TEST E: SLIDING ROOF PANEL DOES NOT OPEN OR CLOSE E1 CHECK WINDOW OPERATION
  • Operate window.
Does window operate? Yes No GO to E2 . SERVICE safety relay circuits. REFER to Section 01-11 . E2 CHECK SUPPLY TO SLIDING ROOF PANEL MOTOR
  • Remove roof sliding panel switch as described.
  • Turn ignition switch to the RUN position.
  • Using a voltmeter connected to a known good ground, check Circuit 400 (LB/BK) at roof sliding panel switch connector C900 for voltage.
Is B+ present? Yes No GO to E3 . SERVICE open Circuit 400 (LB/BK). E3 CHECK SLIDING ROOF PANEL SWITCH GROUND
  • Using an ohmmeter connected to a known good ground, connect second lead to Circuit 57 (BK) at roof sliding panel switch connector C900 . Measure resistance.
Is resistance 5 ohms or less? Yes No INSTALL roof sliding panel switch. GO to E4 . SERVICE Circuit 57 (BK) for open circuit. RESTORE vehicle. RETEST system. E4 CHECK CIRCUIT 692 (R)
  • Using voltmeter connected to ground, back probe Circuit 692 (R) at roof sliding panel switch connector C901 .
  • Toggle roof sliding panel switch to the open position.
Is B+ present? Yes No GO to E5 . REPLACE damaged roof sliding panel switch. RESTORE vehicle. RETEST system. E5 CHECK ROOF SLIDING PANEL SWITCH
  • Using voltmeter connected to ground, back probe Circuit 691 (DB) at roof sliding panel switch connector C901 .
  • Toggle roof sliding panel switch to the closed position.
Is B+ present? Yes No GO to E6 . REPLACE damaged roof sliding panel switch. RESTORE vehicle. RETEST system. E6 CHECK SLIDING ROOF PANEL MOTOR
  • Gain access to sliding roof panel motor as described.
  • Using voltmeter, back probe sliding roof panel motor Circuit (DB) at connector C903 .
  • Toggle roof sliding panel switch to the closed position.
Is B+ present? Yes No GO to E7 . SERVICE Circuit (DB) for open. RESTORE vehicle. RETEST system. E7 CHECK CIRCUIT 692 (R/Y)
  • Using voltmeter, back probe sliding roof panel motor Circuit (R/Y) at connector C903 .
  • Toggle roof sliding panel switch to the open position.
Is B+ present? Yes No REPLACE damaged sliding roof panel motor. RESTORE vehicle. RETEST system. SERVICE Circuit (R/Y) for open. RESTORE vehicle. RETEST system.

Sep 20, 2015 | Lincoln Cars & Trucks

2 Answers

1904 sq feet how do I convert this to linear feet for roofing


I have done tons of roofing and we always use square feet .length X width= sq ft .like 50 ft long by16 =800 then double to get both sides of roof is 1600 sq ft

Feb 12, 2015 | Cars & Trucks

1 Answer

How to attache a lean two to your house


Put a 4x2 the length of ur lean to fix to wall with large 3/8"x5" long bolts an plugs in wall if brick if timber then screw in to that, at a height u want to have the lean,.. to make a mark with a friend place timber with level on and mark wall drill the 4x2,, to take fixings 18" apart along the length then fix to wall, then u will need 2 or 3 up rights to hold roof up u will also need several cross timbers to take roof panels make sure u have a slight fall on roof to out side so rain runs of u will need cross bracing fix wall plat thats what the 4x2 is called up rights in ground add cross bracing then put all others bracing at even spaces in b tween then when all is tight put panels or plastic sheet on roof making

May 07, 2014 | Washing Machines

1 Answer

How do i get the leaves off of my steep metal roof


Buy a snow roof rake.They have poly propolene radial scoops on them they wont dammage roof. You can use it for snow as well. You wont need the latter. Mutch lighter as well.

Nov 28, 2012 | Cars & Trucks

1 Answer

Where do you get the overall height measurement at


3 measurments here
*static height-
*dynamic height-
*suspention height(extended fork length)

static height is measured with a plumb line to the ground at the center of the fork tube top with the motorcycle standing upright and no rider on on it

*dynamic height is the same except your sitting on the motorcycle.

*suspention height /extended fork length is with the front wheel off the ground and measured from the center of the front axle to the top of the fork tube.if tube cap/valve is recessed you still use the top of tube measurement but if it has a cap that screws in on top of the tube then imagine the fork cap removed (measurement stops at the top of tube itself.(most always)

Mar 01, 2012 | 2004 Honda VTX 1300 Retro

1 Answer

Not sure how to find actual length of hip rafters from plumb cut at ridge to birdsmouth at wallplate.I have 2 stanley quick squares but have misplaced the little instruction books.I would appreciate your...


Use Pythagorus. Measure the horizontal length from the plumb ridge cut to the position where the horizontal birds mouth touches the top plate on the wall closest to the ridge. This point should be 1 1/2" in from the outside edge of the wall. This is your run.
Now measure the vertical height from the top of your wall plate to the where the bottom of your vertical cut from the rafter will end up on your ridge. This is your rise.
A squared plus B squared equals C squared. Get your calculator out, if the run is 12 feet and the rise is 4 feet, then 12 squared (144) + 4 squared (16) equals 160. The square root of 160 is 12.65 ft. or 12 feet 7.79" long. There are other ways, but this is most accurate. Make sure your ridge is parallel to you wall.

Sep 29, 2009 | Stanley 46 - 050 10 - 3/4" x 6" Quick...

1 Answer

I need to know how to set the sag on my 2003 Rm 250???


Put it on a stand take a tape measure. find the length from the middle of the axle bolt to the bottom of the fender. Ok next put the bike on the ground and sit on it this may take more people put all of your weight on the bike have some one measure it the same way as when it was on the stand. now find the difference of it. the correct sag should be about 100mm. if it is not the loosen the ring at the top grab the spring and spin it right or left depending on your measurements.

Jun 05, 2009 | 2003 Suzuki RM 250

Not finding what you are looking for?
Garden Logo

Related Topics:

13 people viewed this question

Ask a Question

Usually answered in minutes!

Top Ryobi Garden Experts

Nick Olsen

Level 2 Expert

183 Answers

Rexter1

Level 2 Expert

40 Answers

Roland W VanLue
Roland W VanLue

Level 3 Expert

486 Answers

Are you a Ryobi Garden Expert? Answer questions, earn points and help others

Answer questions

Manuals & User Guides

Loading...