Question about Canon PIXMA iP2000 InkJet Printer

Open Question

Ip2000print head not installed - Canon PIXMA iP2000 InkJet Printer

Posted by Anonymous on

Add Your Answer

Uploading: 0%

my-video-file.mp4

Complete. Click "Add" to insert your video. Add

×

Loading...
Loading...

Related Questions:

1 Answer

2008 CHEVY HHR TORQUE SPECS FOR HEAD


    DO NOT use any sealing material.

  1. Install the cylinder head gasket.
  2. Install the cylinder head.
  3. Install NEW cylinder head bolts.
  4. Caution!Refer to Fastener Notice in Cautions and Notices.

    412510.gif
    Click to Enlarge

  5. Install and tighten the cylinder head bolts in the sequence shown.
  6. Tighten
    Tighten the bolts to 30 N•m (22 lb ft) plus an additional 155 degrees using the J 45059 .

    412425.gif
    Click to Enlarge

  7. Install the NEW front cylinder head bolts.
  8. Tighten
    Tighten the bolts to 35 N•m (26 lb ft).

/f 412425.gif412510.gif

Feb 19, 2013 | 2008 Chevrolet HHR 2.2

1 Answer

Want to know the amount of torque pressure do i use when tightening the head bolts, and whats the sequence?


To install:

0996b43f80208f65.jpg enlarge_icon.gifenlarge_tooltip.gif

Fig. Cylinder head bolt torque sequence-3.8L engine

  1. Install the new cylinder head gasket with the arrow pointing to the front of the engine.
  2. Install the cylinder head.
  3. Install NEW cylinder head bolts. Torque the bolts in sequence, as follows:
    1. Step 1: 37 ft. lbs. (50 Nm).
    2. Step 2: Plus 120 degree turn.
To install:

0996b43f802316ea.jpg enlarge_icon.gifenlarge_tooltip.gif

Fig. Tighten the cylinder head bolts using the following sequence-31L and 3.4L engines

  1. Install the cylinder head with a new gasket.
  2. Apply thread sealer to the head bolts.
  3. Tighten the cylinder head bolts to 37 ft. lbs. (50 Nm) plus an additional 90 degree turn.

Dec 16, 2010 | 2002 Pontiac Grand Prix

1 Answer

NEED HELP WITH TORQUE SPECS ON 1998 CHEVROLET SURBURBAN CYLINDER HEADS 5.7


Cylinder Head Removal & Installation 5.7L Engine To Remove:
  1. Disconnect the negative battery cable.
  2. Drain the engine coolant.
  3. Remove the air cleaner assembly.
  4. Remove the upper radiator hose.
  5. Remove both heater hoses.
  6. Disconnect spark plug wires at distributor cap.
  7. Remove distributor cap.
  8. Remove the coolant bypass hose from the water pump.
  9. Remove the drive belt. NOTE: It is not necessary to evacuate the A/C refrigerant.
  10. Remove the A/C compressor from the mounting bracket and set it aside.
  11. Remove the wiring bracket from the rear of the cylinder head.
  12. Disconnect the accessory bracket and slide forward.
  13. Remove the upper and lower intake manifold.
  14. Remove the exhaust manifolds.
  15. Remove the valve rocker arms and pushrods.
  16. Remove the power steering pump pulley.
  17. Disconnect the electrical connector from the power steering pump.
  18. Remove nuts attaching the power steering pump to the engine.
  19. Remove power steering pump mounting bracket bolts and nut.
  20. Slide power steering pump/bracket assembly forward and remove stud.
  21. Set power steering pump/bracket assembly aside.
  22. Disconnect the wiring bracket from rear of the right cylinder head.
  23. Remove the generator.
  24. Remove the oil indicator tube bracket bolt.
  25. Remove the generator mounting bracket.
  26. Remove the sixteen cylinder head bolts.
  27. Remove cylinder heads and gaskets.
  28. Clean all sealing surfaces.
To Install:
Right Side NOTE: Clean all dirt, debris, and coolant from the engine block cylinder head bolt holes. Failure to remove all foreign material may result in damaged threads, improperly tightened fasteners or damage to components.
NOTE: Do not use any type of sealant on the cylinder head gasket (unless specified).
  1. Clean the cylinder head bolt holes with a thread chaser and compressed air.
  2. Check the cylinder head locating pins for proper installation.
  3. Place a new cylinder head gasket over the engine block dowel pins.
  4. Install the cylinder head to the engine block.
  5. Apply sealant (GM P/N 12346004 or equivalent) to cylinder head bolt threads.
  6. Install the cylinder head bolts. gm-03-50-685.gif

  7. Tighten the cylinder head bolts in sequence on the first pass.
    • Torque to: 22 ft. lbs. (30 Nm)
  8. Using a torque angle meter, tighten the long bolts (1, 2, 5, 6, 9, 10 and 13) on the second pass in sequence to 75°.
  9. Using a torque angle meter, tighten the medium bolts (14 and 17) on the second pass in sequence to 65°.
  10. Using a torque angle meter, tighten the short bolts (3, 4, 7, 8, 11, 12, 15 and 16) on the second pass in sequence to 55°.
  11. Install the valve rocker arms and pushrods.
  12. Install the generator mounting bracket stud.
    • Torque to: 15 ft. lbs. (20 Nm)
  13. Loosely assemble the generator mounting bracket over the stud.
  14. Install all nuts and bolts finger tight.
    • Torque to: 30 ft. lbs. (41 Nm)
  15. Install the generator.
  16. Install the oil indicator tube bracket bolt.
  17. Install the exhaust manifold.
  18. Install the lower intake manifold.
  19. Install the valve rocker arm covers.
  20. Install the wiring bracket to the rear of the cylinder head.
  21. Connect the accessory bracket.
  22. Install the A/C compressor.
  23. Install the drive belt.
  24. Install the distributor cap.
  25. Connect the spark plug wires to the distributor cap.
  26. Install both heater hoses.
  27. Install the upper radiator hose.
  28. Install the air cleaner assembly.
  29. Refill the engine coolant.
  30. Connect the negative battery cable.
Left Side To Install:
NOTE: Clean all dirt, debris, and coolant from the engine block cylinder head bolt holes. Failure to remove all foreign material may result in damaged threads, improperly tightened fasteners or damage to components.
NOTE: Do not use any type of sealant on the cylinder head gasket (unless specified).
NOTE: Clean all dirt, debris, and coolant from the engine block cylinder head bolt holes. Failure to remove all foreign material may result in damaged threads, improperly tightened fasteners or damage to components.
NOTE: Do not use any type of sealant on the cylinder head gasket (unless specified).
  1. Clean the cylinder head bolt holes with a thread chaser and compressed air.
  2. Check the cylinder head locating pins for proper installation.
  3. Place a new cylinder head gasket over the engine block dowel pins.
  4. Install the cylinder head to the engine block.
  5. Apply sealant (GM P/N 12346004 or equivalent) to cylinder head bolt threads.
  6. Install the cylinder head bolts. gm-03-50-685.gif

  7. Tighten the cylinder head bolts in sequence on the first pass.
    • Torque to: 22 ft. lbs. (30 Nm)
  8. Using a torque angle meter, tighten the long bolts (1, 2, 5, 6, 9, 10 and 13) on the second pass in sequence to 75°.
  9. Using a torque angle meter, tighten the medium bolts (14 and 17) on the second pass in sequence to 65°.
  10. Using a torque angle meter, tighten the short bolts (3, 4, 7, 8, 11, 12, 15 and 16) on the second pass in sequence to 55°.
  11. Install the valve rocker arms and pushrods.
  12. Install the power steering pump mounting bracket stud.
    • Torque to: 15 ft. lbs. (20 Nm)
  13. Loosely assemble the mounting bracket over the stud.
  14. Install all nuts and bolts finger tight.
    • Torque to: 30 ft. lbs. (41 Nm)
  15. Install the power steering pump pulley.
  16. Connect the electrical connector to the power steering pump.
  17. Install the exhaust manifold.
  18. Install the lower intake manifold.
  19. Install the valve rocker arm covers.
  20. Install the wiring bracket to the rear of the cylinder head.
  21. Connect the accessory bracket.
  22. Install the A/C compressor.
  23. Install the drive belt.
  24. Install the distributor cap.
  25. Connect the spark plug wires to the distributor cap.
  26. Install both heater hoses.
  27. Install the upper radiator hose.
  28. Install the air cleaner assembly.
  29. Refill the engine coolant.
  30. Connect the negative battery cable.

Aug 31, 2010 | Chevrolet Suburban 1500 Cars & Trucks

2 Answers

What r the torque specifications on installing a head on a 1999 yukon and the tightening sequence


Check this procedure...
  1. Tighten the first design cylinder head bolts as follows:
    1. M11 bolts 1st pass: in sequence to 22 ft. lbs. (30 Nm).
    2. M11 bolts 2nd pass: in sequence + 90 degrees.
    3. M11 bolts (1,2,3,4,5,6,7,8): + 90 degrees.
    4. M11 bolts (9 and 10): + 50 degrees.
    5. M8 cylinder head bolts (11,12,13,14,15) to 22 ft. lbs. (30 Nm). Begin with the center bolt (11) and alternating side-to-side, work outward tightening all of the bolts.
  2. Tighten the second design cylinder head bolts as follows:
    1. M11 bolts (1-10) 1st pass: in sequence to 22 ft. lbs. (30 Nm).
    2. M11 bolts (1-10) 2nd pass: in sequence + 90 degrees.
    3. M11 bolts (1-10): + 70 degrees.
    4. M8 cylinder head bolts (11,12,13,14,15) to 22 ft. lbs. (30 Nm). Begin with the center bolt (11) and alternating side-to-side, work outward tightening all of the bolts.

c409909.jpg

Fig. Cylinder head bolt tightening sequence-4.8L, 5.3L and 6.0L engines (click for zoom)


Install the cylinder head bolts in sequence to 22 ft. lbs. (30 Nm). The bolts must be tightened once, then be tightened again in sequence in the following order:
  1. Step 1: Short length bolt: (3, 4, 7, 8, 11, 12, 15, 16), plus 55 degrees.
  2. Step 2: Medium length bolt: (14, 17), plus 65 degrees.
  3. Step 3: Long length bolts: (1, 2, 5, 6, 9, 10, 13), plus 75 degrees.

7f05cb7.jpg

Fig. Cylinder head bolt tightening sequence-5.0L and 5.7L engines

Aug 04, 2010 | 1999 GMC Yukon Denali

2 Answers

Torque specification on a 2003 alero cylinder heads 3.4 liter


3.4L Engine To Remove:
  1. Remove the lower intake manifold.
  2. Remove the exhaust crossover pipe.
  3. If removing the right cylinder head, remove the catalytic converter from exhaust manifold.
  4. If removing the left cylinder head, remove the engine oil dipstick and tube.
  5. Remove the rocker arms and pushrods.
  6. Remove and discard the cylinder head bolts.
  7. Remove the cylinder head.
  8. Clean the mating surfaces on the following items:
    • Cylinder head
    • Cylinder block
    • Intake manifold
  9. Clean the cylinder block bolt threads.
NOTE: During disassembly, keep the valve train components together for proper location during assembly.
To Install:
NOTE: Coat the cylinder head bolt threads using thread sealer.
  1. If removed, install the following components:
    • Exhaust manifold
    • Accessory studs
    • Spark plugs
  2. Place the cylinder head gasket in position over the dowel pins. Ensure that the THIS SIDE UP note is showing.
  3. Install the cylinder head. Cylinder head torque sequence ’99-‘00 gmpc_v6_14.gif

    Cylinder head torque sequence ’01-05 gm-03-34-682.gif

  4. Install the new cylinder head bolts.
    • Tighten the cylinder head bolts a first pass to 44 ft lb (60 Nm).
  5. Tighten the cylinder head bolts in sequence an additional 95 degrees.
  6. Install the intake gasket.
  7. Install the pushrods and rocker arms.
  8. Raise and support the vehicle.
  9. Install the catalytic converter and dipstick tube and indicator if removed.
  10. Lower the vehicle.
  11. Install the exhaust crossover pipe.
  12. Install the intake manifolds.
  13. Connect negative battery cable.
  14. Fill the cooling system.

Jul 03, 2010 | 2003 Oldsmobile Alero

1 Answer

ERROR MESSAGE U051


Print head not installed,
or not properly
installed.
[1401] U051 Print head is not installed. Install
the print head.
Install the print head properly.


It may be that print head is defective or main PCB assy

Jan 12, 2010 | Canon PIXMA MP530 All-In-One InkJet...

2 Answers

Five flashes pause then a further 5 flashes


This error mean "non installed or defective print head".First open cover and remove the ink cartridges.Then open holder and remove the print head.Clean the contacts on printer and print head using piece of cotton and some alcohol.Then put back all again.If the problem persist you need to replace the print head.It's part number is QY6-0057.

Nov 25, 2009 | Canon PIXMA iP5000 InkJet Photo Printer

1 Answer

Printer


Maybe you mistyped? Is it 'head or 'header'. I believe it is head you want to say. In that case your printer requires a new print-head to be installed.
Your printer has separate ink tanks and heads for printing. The head has a limited life although it works for along time.
The printer should indicated which color head needs to be installed. Try cleaning the head with the printer software first.
You can purchase the head of that color (or colors if more than one) and follow the install procedure in the printer manual.
If you also want head installation instructions, please take some time to post it as a separate question. I will try to give complete instructions.

Oct 12, 2009 | Canon I900D InkJet Photo Printer

4 Answers

Canon i9950


Seems impossible to reset the counter, is there a way to manually reset?

Oct 10, 2007 | Canon BubbleJet i9950 InkJet Photo Printer

Not finding what you are looking for?
Canon PIXMA iP2000 InkJet Printer Logo

Related Topics:

28 people viewed this question

Ask a Question

Usually answered in minutes!

Top Canon Office Equipment & Supplies Experts

kakima

Level 3 Expert

102366 Answers

old marine
old marine

Level 3 Expert

1917 Answers

Doctor PC
Doctor PC

Level 3 Expert

7733 Answers

Are you a Canon Office Equipment and Supply Expert? Answer questions, earn points and help others

Answer questions

Manuals & User Guides

Loading...