Question about Building Materials

1 Answer

How do I install interlock plank flooring.

I am installing some flooring in a camper, and I'm trying to figure out the best way to go about install the flooring

Posted by on

1 Answer

  • Level 1:

    An expert who has achieved level 1.

  • Contributor
  • 1 Answer

Start with the longest wall. Direction of the floor should be the long way. any legs in you way, take out first.

Posted on Apr 28, 2014

1 Suggested Answer

6ya6ya
  • 2 Answers

SOURCE: I have freestanding Series 8 dishwasher. Lately during the filling cycle water hammer is occurring. How can this be resolved

Hi,
a 6ya expert can help you resolve that issue over the phone in a minute or two.
best thing about this new service is that you are never placed on hold and get to talk to real repairmen in the US.
the service is completely free and covers almost anything you can think of (from cars to computers, handyman, and even drones).
click here to download the app (for users in the US for now) and get all the help you need.
goodluck!

Posted on Jan 02, 2017

Add Your Answer

Uploading: 0%

my-video-file.mp4

Complete. Click "Add" to insert your video. Add

×

Loading...
Loading...

Related Questions:

2 Answers

What do i need to know about installing wood floor


What type of wood flooring is it, is it glue down or nail down, engineered ( like plywood) or solid? Is the subfloor wood or concrete ect.
Always follow manufactures specs as far as acclimation, type of adhesive and expansion joints.

Feb 26, 2016 | Building Materials

2 Answers

Chevron Parquet Flooring


Help me to get more flooring ideas.

Oct 07, 2015 | Building Materials

1 Answer

Can plywood be glued to tile floor before laying vinyl planks ??


There are cement based compounds on the market that will allow you to just go over top of your tile floor. Make sure your tile floor is not loose anywhere, clean the floor well and use a patching compound over the existing tiles (this will fill in the grout lines and any uneven areas of the tile). It may take a couple of coats, maybe even 3 to get the floor smooth and level. You should be able to install your vinyl right on top of this and not have the added height of the plywood. If you insist on the plywood you could use a good quality construction adhesive with drilling and installing screws.

Mar 06, 2015 | Building Materials

1 Answer

Flooring


Random-length tongue & groove planks? First step - plan it VERY carefully. Get a floor staper or floor nailer - buy one from Harbor Freight instead of renting one. You\'ll need an air compressor capable of powering the flooring nailer; I find that a 5-gallon 2HP compressor is just about enough.



Also get a miter saw before you start, and a drill motor, and a claw hammer and a "Flooring installation kit" from Harbor Freight (they\'re handy), and it\'s worth doing to get a flooring jack from the same place. You\'ll need a triangular layout square or adjustable square and several pencils.



Be prepared for some heavy carrying. Boxes of flooring are heavy, especially at the end of a long day.



Figure out how many square feet to lay, and add 10% to 20% for waste, depending upon how careful you figure you are. I just laid 2400 square feet of it with only about 1% waste, but I\'m VERY careful.



Buy your flooring and stack the boxes inside the room where you\'ll be laying it down. Leave it there, untouched, for no less than three weeks to acclimate to the humidity in that room - longer is better. You can\'t wait too long.



Also buy at least one roll of red rosin-impregnated flooring paper and get hold of a stapler for it. You\'ll also need plenty of flooring staples/nails.



Plan which orientation the flooring will be laid - it usually runs along the longest walls. Plan which side of the room to start on. Find everything you\'ll need to fit around and figure out how to fit the flooring around those obstructions. Heating pipes, ducts, chimney, etc. Places where one piece will wrap partway around an obstruction will be challenging because you\'ll need to make one or two crosscuts and a short rip between them - I prefer to use a bandsaw for the short rip, but you CAN use a handheld sabre saw.



Prepare the underlayment. Get it VERY CLEAN. Sweep often while you work. OFTEN. Don\'t allow any dirt or sawdust or anything under the flooring.



Staple a strip of rosin paper to the floor along the starting wall. It should reach all the way from one end to the other, and it should have NO WRINKLES. If you tear it (it does tear easily), staple both sides of the tear down flat. Sweep again.



Beginning at the starting wall, lay out enough planks to reach all the way along the room to the other end, leaving enough to cut off - you\'ll need the cut-off scrap to start the next course, so select that last piece with a length such that the cut-off scrap\'s end will not coincide with any joint in the first course; the joints in each course should not be nearer than about 6" from the joints in the preceding course - always always remember that, and select planks religiously with that in mind.



Drill a line of holes along the groove edge of the first course of planks. The holes should barely be big enough to fit a #6 finishing nail; I think a 5/64" drill bit is about the right size. The holes should be about 2" from each end of each plank, and about every 6" along the length of the plank. The holes should be near to the groove edge, about 1/2" from the edge, and angled toward the wall at the bottom - when you drive those nails in, you don\'t want your hammer to hit the wall.



Also drill a matching set of holes along the tongue edge, but these holes will be different. This time, start the hole on top of the TONGUE, where it meets the plank, and angle the drill slightly so the drill bit exits the bottom of the PLANK, not the bottom of the groove. If you just drill through the groove, you\'ll never get the next plank to fit over the tongue.



Now very very carefully lay out the planks for that first course. If this one course isn\'t absolutely straight, the rest of the floor will just get worse from there. Keep the groove edge of the first course 5/8" to 3/4" away from the wall along its full length - you may need to replace existing baseboard to do that. Later, you\'ll hide the gap when you put the baseboard back down.



When you\'re SURE that the first course is laid out straight, drive nails into the groove edge holes to hold it there. Drive them down flush with the hammer, then sink them slightly with a nail set (the right size for #6 nails). When you\'re finished, go back and nail down the tongue edge, too, one nail per drilled hole. Also set those nails with your nail set.



Carefully cut that last plank so that its end is 5/8" to 3/4" from the far wall. Carry the cutoff back to the starting point.



Put away your drill & nails & nailset for a while - you won\'t need them again until you get to the opposite wall (or have an obstruction to deal with). From here for the rest of the floor, you\'ll need the flooring stapler/nailer.



Starting with your cutoff, now select the second coarse of planks. You should be selecting planks from several boxes at the same time; the finish may be slightly different from box to box, and it\'s better to have the differences show up randomly than to have them show up in patches.



Select each plank so that its end doesn\'t coincide with the joints in the first course. Remember, 6" is the closest they should be. Also remember the last plank - cut it again so its cutoff end won\'t coincide with the first (cutoff) plank in this second course - it\'ll be used to start the third course.



When you have your planks selected, this time there\'s no need to drill anything - you\'ll use the flooring stapler/nailer. Connect it to the compressor and carry it and its special mallet to your starting point.



Before you staple/nail, the second course of planks needs to be driven into place against the first course. The plastic block from your "flooring installation kit" is perfect for the task. The groove from each course should completely cover the tongue from the previous course, and all joints should be driven VERY TIGHT before stapling/nailing. Some planks will be slightly curved - you can usually start one end, then drive the other end into place (you may need the flooring jack to help with this) before stapling/nailing it the rest of the way.



If you need to use the flooring jack in the middle of the floor, just nail a short piece of 2x4 to the floor and jack against it. Use scaffold (two heads) nails, so it\'ll be easy to remove.



Drive staples/nails with the flooring stapler/nailer about every 6" along the tongue edge of this course. The tool is built to hook over the tongue edge and drive the staples/nails at an angle so the fasteners won\'t interfere with the fit of the next course of planks. One staple/nail should be about 2" from each end of each plank, 6" (roughly) between staples/nails. Yes, it\'s a LOT of staples/nails when you add them all up - 2000, 3000 per room.



Once in a while a staple/nail won\'t drive correctly. You\'ll need to either break it off or pull it out before driving another. You\'ll need to use your imagination - there are lots of approaches. Dig it out with a screwdriver, grab it with diagonal wire cutters, pull it with fencing pliers, use electrician\'s pliers and a pry bar. Do whatever it takes. Some will simply break off - the steel they use to make \'em gets pretty brittle when you bend it back & forth a couple of times. While you\'re worrying one out, use a putty knife to protect the flooring from your tools.



When you\'ve laid enough courses to get within one plank\'s width from the far edge of your red rosin paper, stop and staple down another course of paper, overlapping the first course by about 4". Do this every time you "run out of paper". The paper will eventually cover the whole floor, under your new plank floor.



Just about the time you staple down that second strip of rosin paper, gather up empty flooring boxes and start putting your tools on them, including the air compressor. When you\'re about halfway across the room, you\'ll move all your tools (including the air compressor) up onto the new flooring, and the cardboard boxes will help protect the nice new floor from damage from your tools.



Continue to work across the room - paper and flooring - until you get so close to the far wall that you\'re in danger of bumping the wall with the flooring stapler/nailer\'s mallet. It WILL leave an AWFUL black mark in the wall. Put an ordinary sock over its rubber pull to help prevent the marks. The last course you can staple/nail with that tool will be the course where you have to really choke up on the mallet to get it into the narrow space between the tool & the wall. Finish that course and put the tool away, turn off the compressor, get them out of the room.



The next course of flooring will need to be drilled & hand-nailed again, this time ONLY along the tongue edge, but otherwise exactly as you drilled the tongue edge of the first course.



The last course will need to be ripped to width (a borrowed or rented table saw is the ideal tool for this purpose) so that it ends up 5/8" to 3/4" from the wall. It\'ll need to be face-nailed along the wall edge - exactly the way you drilled the groove side on the first course, but this time there\'s no groove - only the freshly ripped edge of the plank.

Jun 28, 2014 | Crafts & Hobbies

1 Answer

Brake shift interlock solenoid


column or floor shifter ?
Brake Shift Interlock Actuator - Floor Shift Removal and Installation
NOTE: The brake shift interlock actuator is not serviced individually. If replacement is required, install a new floor shift selector lever assembly.
For additional information, refer to Selector Lever - Floor Shift in this section.
Brake Shift Interlock Actuator - Column Shift Removal and Installation
  1. Set the parking brake.
  1. Remove the steering column shrouds.
  1. Turn the ignition to the accessory position and apply the brake or actuate the brake shift interlock actuator (BSIA) override.
  1. Put the selector lever into the NEUTRAL position.
  1. Disconnect the BSIA electrical connector.
  1. Remove the BSIA screw.
  1. Gently pry the clip up and remove the BSIA.
  1. NOTE: During installation, verify that the BSIA override has been activated and the slider is fully rearward. Before rotating the selector lever from NEUTRAL into PARK, align the selector lever tab into the BSIA. To install, reverse the removal procedure.

May 26, 2017 | Ford Expedition Cars & Trucks

1 Answer

Freefit vinyl flooring coming up


Where it is coming up, the vinyl planks will need to be glued down with the recommended adhesive. You will need to contact the manufacturer of the planks to find out which adhesive the want you to use.

Nov 25, 2013 | FreeFit Plank Tigerwood Vinyl Flooring

1 Answer

Can I walk on top of a 2003 wilderness youkon camper?


I would no advise it as most campers have very little strength in the roof section. If you really have to get on the roof then use a plank that rests on both edges and walk on that

Jul 09, 2013 | Electronics - Others

2 Answers

Can I install laminated floor in my bathroom?


Laminated floors can be used in any room you would like although there are some laminated floors that are more sensitive to moisture. If you want to use laminated floor in your bathroom you will need to prevent water from core material of the floor.

Feb 06, 2013 | Building Materials

1 Answer

How to divide 12 11/16 inches into 71 3/8 inches?


you will need 5 full planks = 68 1/4 inches and the last board will need to be 3 7/16 inches wide.

Nov 15, 2009 | Freud FT750T Laminate Trimmer

2 Answers

Can you use irobot Scooba on laminate floors?


they are suppose to be hardwood floor safe but maybe you should call the manurfacturer and make sure

Mar 21, 2009 | iRobot 5800 Scooba Vacuum

Not finding what you are looking for?
Building Materials Logo

Related Topics:

133 people viewed this question

Ask a Question

Usually answered in minutes!

Top Building Materials Experts

hpgwva

Level 2 Expert

130 Answers

Tom Chichester

Level 3 Expert

34100 Answers

ray gallant

Level 3 Expert

42881 Answers

Are you a Building Material Expert? Answer questions, earn points and help others

Answer questions

Manuals & User Guides

Loading...