Question about Computers & Internet

Open Question

Primavera P6 project management has stop working .a problem caused the program to stop working correctly

Posted by Anonymous on

Ad

6 Suggested Answers

6ya6ya
  • 2 Answers

SOURCE: I have freestanding Series 8 dishwasher. Lately during the filling cycle water hammer is occurring. How can this be resolved

Hi there,
Save hours of searching online or wasting money on unnecessary repairs by talking to a 6YA Expert who can help you resolve this issue over the phone in a minute or two.

Best thing about this new service is that you are never placed on hold and get to talk to real repairmen in the US.

Here's a link to this great service

Good luck!

Posted on Jan 02, 2017

Ad
registerthis
  • 78 Answers

SOURCE: a problem caused the program to close

Remove the program using ctrl/panel and remove programs and then reboot system. Now install program again. It should work now.

Posted on Feb 07, 2009

Ad
  • 7 Answers

SOURCE: HP CUE-Scanning flow component has stopped working. a problem caused the program to stop working correctly.

check out the below link which worked for most of the hp products

<a href="http://hpanswers.blogspot.com/2008/07/hp-cue-scanning-flow-component-has.html">Click here for the working solution</a>

Posted on Jul 03, 2009

  • 35 Answers

SOURCE: I can start my Primavera P6 with OS windows 7, I

thx is ****

Posted on Oct 23, 2009

satish rana
  • 18 Answers

SOURCE: i am using windows 7 64 bit home edition i cannot

it may be your pimavera project mangement not to support 64 bit it can be it support 32 bit reinstall you primavera project management release and then restart your compute.frist see the configuration of your software database

Posted on Apr 03, 2010

  • 71 Answers

SOURCE: Sony vegas won't start. It says: Creating file I/O

This means that the program has been corrupted. you need to remove and re-install the program via ADD REMOVE PROGRAMS in the Control Panel.

This should make the program run smoothly.

Posted on Oct 30, 2010

Add Your Answer

Uploading: 0%

my-video-file.mp4

Complete. Click "Add" to insert your video. Add

×

Loading...
Loading...

Related Questions:

1 Answer

Does primavera 3 works on win 8 ??


There are a lot of questions about this, without any answers! So I guess the answer is 'No'
It seems you would need to install both versions P6 and P3 on Win 8 then export P3 files to P6 to run, but even that isn't easy.

Jan 24, 2014 | Primavera Project Planner P3 (PRIMAVERAP3)...

1 Answer

I just installed Primavera Project Management , and Methodology management. After logging in with the default username of admin and password of admin it comes back with the message " Unable to connect


You must connect to a database to utilize Primavera. You can not bypass this portion. So, Either remove the Database and reconfigure, or in the "Configure" Screen you can Name a new DB and use it. I would suggest that if you do not require 2 DB's not to have two. "The Oracle Database 10g" application that is installed with P6 (In your 'All Programs') will give you some DB manipulation options. Other wise refer to the TenSix link to clarify DB Config
http://www.tensixconsulting.com/2013/03/primavera-p6-database-connection-configuration-details/

Feb 13, 2013 | Primavera Contractor 6.1 Full Version for...

1 Answer

I did not find any site for P6 manual free download.


Did you try to Google it? I'll try and let you know......okay, here is a website I found after Googling this. Let me know if it helps. Look at the right hand side of the site that talks about the P6 manual.
carsandcomps,
Guru, Premium Expert @ Fixya.com
http://www.scribd.com/doc/21590121/Primavera-P6-Project-Management-Refrence-Manual

Jan 18, 2011 | Computers & Internet

1 Answer

Can't configure the database connection for Primavera p6


i just installed Primavera Project Management , and Methodology management. After logging in with the default username of admin and password of admin it comes back with the message " Unable to connect to the database. Would you like to configure the database connection now?" How do I get around this challenge? iam using vista

Feb 05, 2010 | Primavera Contractor 6.1 Full Version for...

1 Answer

Im not able to instalthe primavera p6 on my new hp lap windows 7


Before installing primavera p6, check whether any SQL databases with the same name exists. Uninstall the SQL if the databases created during the previous failure installation of primavera p6(go to add or remove programs to uninstall). After uninstallation of SQL express, try to run installation files for primavera p6 will solve your problem.

Revert back for more assistance.

Dec 26, 2009 | Computers & Internet

4 Answers

Which version of windows 7 goes with primavera 6


It works with Win 7 Ultimate, but it should work with all versions -you need to install SQL Server SP3 BEFORE running P6 for the first timethough...

SQLServer2005SP3-KB955706-x86-ENU.exe

Nov 17, 2009 | Primavera Project Planner P3 (PRIMAVERAP3)...

1 Answer

P5 tutorial


i am a p3 user i want to use p6 but i dont understant how to use for that i need p6 tutorial so that i can use p6 easily

Jun 25, 2009 | Primavera Project Planner P3 (PRIMAVERAP3)...

2 Answers

Primavera financial reporting


Have you considered creating a regular export from P6 and using Access or some other reporting tool to generate your reports? I could set you something if I new the specifics of what you are trying to get.

Feb 10, 2009 | Primavera Contractor 6.1 Full Version for...

1 Answer

Importing MSP Files into P6


There is a simple solution to import mpp files into P6.

Please contact me.
Boruziniyat@gmail.com

Oct 22, 2008 | Computers & Internet

Not finding what you are looking for?
Computers & Internet Logo

Related Topics:

126 people viewed this question

Ask a Question

Usually answered in minutes!

Top Computers & Internet Experts

Les Dickinson
Les Dickinson

Level 3 Expert

18424 Answers

Doctor PC
Doctor PC

Level 3 Expert

7733 Answers

David Payne
David Payne

Level 3 Expert

14162 Answers

Are you a Computer and Internet Expert? Answer questions, earn points and help others

Answer questions

Manuals & User Guides

Loading...