Which operating system does primavera p6 support I have windows vista loaded in my lap top, p6 is not working on this. Could any one help me It is showing database error

Posted by on

Ad

2 Answers

  • Level 1:

    An expert who has achieved level 1.

  • Contributor
  • 2 Answers

I'm running P6 on Vista successfully.

Posted on Jul 22, 2009

Ad
  • Level 2:

    An expert who has achieved level 2 by getting 100 points

    MVP:

    An expert that gotĀ 5 achievements.

    Governor:

    An expert whose answer gotĀ voted for 20 times.

    Hot-Shot:

    An expert who has answered 20 questions.

  • Expert
  • 148 Answers

You can find everything here only http://www.primavera.com/.

Posted on May 07, 2009

Ad

1 Suggested Answer

6ya6ya
  • 2 Answers

SOURCE: I have freestanding Series 8 dishwasher. Lately during the filling cycle water hammer is occurring. How can this be resolved

Hi,
a 6ya expert can help you resolve that issue over the phone in a minute or two.
Best thing about this new service is that you are never placed on hold and get to talk to real repairmen in the US.
New users get to try the service completely Free afterwhich it costs $6 per call and covers almost anything you can think of (from cars to computers, handyman, and even drones).
click here to download the app (for users in the US for now) and get all the help you need.
Goodluck!

Posted on Jan 02, 2017

Add Your Answer

Uploading: 0%

my-video-file.mp4

Complete. Click "Add" to insert your video. Add

×

Loading...
Loading...

Related Questions:

1 Answer

I can start my Primavera P6 with OS windows 7, I use P6 stand alone. database configuration said ''Bad public user name or...


The standalone DB Configuration seems simple but can be tricky When you configure the DB you have to use a Coded Username for the AdminSuperuser permissions "admprm$pm"! this user name makes your actual Log in username "Admin" you cannot use the admprm$pm at the Log in screen. Same with the Public User Permissions "pubprm$pm" gives read permissions but log in user name is "Public" Try the "Admin/Public" usernames if this does not work you may have to Uninstall and Reinstall. If you uninstall remember there are 2 peices of software to remove... P6 and the Oracle Database 10G
Refer to: http://www.tensixconsulting.com/2013/03/primavera-p6-database-connection-configuration-details/ For further DB Config Issues.

Mar 25, 2013 | Primavera Contractor 6.1 Full Version for...

1 Answer

How to install P6 V7 in 64 bit windows 7 system


I installed P6 Ver 7 standalone on my laptop with windows vista and it was done easily and succeed ( working) whwn I installed on my other computer with windows 7 64 bit, I succeed installing it but when I turn on it is asking which database. On my laptop with windows vista , I will just type admin as password on my automatically shown ORAPMDB database, and it works.
What do you think the issue here?

Aug 22, 2011 | Primavera Contractor 6.1 Full Version for...

1 Answer

Im not able to instalthe primavera p6 on my new hp lap windows 7


Before installing primavera p6, check whether any SQL databases with the same name exists. Uninstall the SQL if the databases created during the previous failure installation of primavera p6(go to add or remove programs to uninstall). After uninstallation of SQL express, try to run installation files for primavera p6 will solve your problem.

Revert back for more assistance.

Dec 26, 2009 | Computers & Internet

4 Answers

Which version of windows 7 goes with primavera 6


It works with Win 7 Ultimate, but it should work with all versions -you need to install SQL Server SP3 BEFORE running P6 for the first timethough...

SQLServer2005SP3-KB955706-x86-ENU.exe

Nov 17, 2009 | Primavera Project Planner P3 (PRIMAVERAP3)...

2 Answers

Primavera financial reporting


Have you considered creating a regular export from P6 and using Access or some other reporting tool to generate your reports? I could set you something if I new the specifics of what you are trying to get.

Feb 10, 2009 | Primavera Contractor 6.1 Full Version for...

1 Answer

Windows vista- no sound on avi videos!


update u soud drivers with the last driver and Down load and try Divx.

Jul 07, 2008 | Acer Aspire 5500 5570-2609 Laptop

3 Answers

Primavera P6


I am new in P6. I have a problem that how can we add target in any project like P3? Can u please help me.

Jun 20, 2008 | Primavera Computers & Internet

Not finding what you are looking for?
Computers & Internet Logo

Related Topics:

1,061 people viewed this question

Ask a Question

Usually answered in minutes!

Top Microsoft Computers & Internet Experts

micky dee

Level 3 Expert

2841 Answers

Piyal Perera
Piyal Perera

Level 3 Expert

528 Answers

Les Dickinson
Les Dickinson

Level 3 Expert

18402 Answers

Are you a Microsoft Computer and Internet Expert? Answer questions, earn points and help others

Answer questions

Manuals & User Guides

Loading...