Primavera P6 Professional R8.2 Stopped Working

Posted by Anonymous on

6 Suggested Answers

6ya6ya
  • 2 Answers

SOURCE: I have freestanding Series 8 dishwasher. Lately during the filling cycle water hammer is occurring. How can this be resolved

Hi,
a 6ya expert can help you resolve that issue over the phone in a minute or two.
best thing about this new service is that you are never placed on hold and get to talk to real repairmen in the US.
the service is completely free and covers almost anything you can think of (from cars to computers, handyman, and even drones).
click here to download the app (for users in the US for now) and get all the help you need.
goodluck!

Posted on Jan 02, 2017

mehta_gops
  • 4 Answers

SOURCE: Hi, I am looking for a 60 day trial version of

Hi Visit the link for software. It will work
http://thepiratebay.org/torrent/4266886/Primavera_Project_Planner_P6

Posted on Aug 08, 2009

  • 35 Answers

SOURCE: I can start my Primavera P6 with OS windows 7, I

thx is ****

Posted on Oct 23, 2009

  • 1 Answer

SOURCE: My Primavera P6 is not letting me export it to a

You should install Primavera 3 on your computer in order to activate the export for P3

Posted on Feb 05, 2010

  • 11800 Answers

SOURCE: I completed a schedule in

No, 3.0a doesn't have the capability to export to a .xer file. But it can export a P3 or MPX file which P6 can import without a problem.

Posted on Feb 14, 2011

  • 1 Answer

SOURCE: can't configure the database connection for Primavera p6

i just installed Primavera Project Management , and Methodology management. After logging in with the default username of admin and password of admin it comes back with the message " Unable to connect to the database. Would you like to configure the database connection now?" How do I get around this challenge? iam using vista

Posted on Oct 16, 2012

Add Your Answer

Uploading: 0%

my-video-file.mp4

Complete. Click "Add" to insert your video. Add

×

Loading...
Loading...

Related Questions:

1 Answer

Does primavera 3 works on win 8 ??


There are a lot of questions about this, without any answers! So I guess the answer is 'No'
It seems you would need to install both versions P6 and P3 on Win 8 then export P3 files to P6 to run, but even that isn't easy.

Jan 24, 2014 | Primavera Project Planner P3 (PRIMAVERAP3)...

1 Answer

I can start my Primavera P6 with OS windows 7, I use P6 stand alone. database configuration said ''Bad public user name or...


The standalone DB Configuration seems simple but can be tricky When you configure the DB you have to use a Coded Username for the AdminSuperuser permissions "admprm$pm"! this user name makes your actual Log in username "Admin" you cannot use the admprm$pm at the Log in screen. Same with the Public User Permissions "pubprm$pm" gives read permissions but log in user name is "Public" Try the "Admin/Public" usernames if this does not work you may have to Uninstall and Reinstall. If you uninstall remember there are 2 peices of software to remove... P6 and the Oracle Database 10G
Refer to: http://www.tensixconsulting.com/2013/03/primavera-p6-database-connection-configuration-details/ For further DB Config Issues.

Mar 25, 2013 | Primavera Contractor 6.1 Full Version for...

1 Answer

Im not able to instalthe primavera p6 on my new hp lap windows 7


Before installing primavera p6, check whether any SQL databases with the same name exists. Uninstall the SQL if the databases created during the previous failure installation of primavera p6(go to add or remove programs to uninstall). After uninstallation of SQL express, try to run installation files for primavera p6 will solve your problem.

Revert back for more assistance.

Dec 26, 2009 | Computers & Internet

4 Answers

Which version of windows 7 goes with primavera 6


It works with Win 7 Ultimate, but it should work with all versions -you need to install SQL Server SP3 BEFORE running P6 for the first timethough...

SQLServer2005SP3-KB955706-x86-ENU.exe

Nov 17, 2009 | Primavera Project Planner P3 (PRIMAVERAP3)...

1 Answer

P5 tutorial


i am a p3 user i want to use p6 but i dont understant how to use for that i need p6 tutorial so that i can use p6 easily

Jun 25, 2009 | Primavera Project Planner P3 (PRIMAVERAP3)...

2 Answers

Primavera financial reporting


Have you considered creating a regular export from P6 and using Access or some other reporting tool to generate your reports? I could set you something if I new the specifics of what you are trying to get.

Feb 10, 2009 | Primavera Contractor 6.1 Full Version for...

Not finding what you are looking for?
Computers & Internet Logo

Related Topics:

110 people viewed this question

Ask a Question

Usually answered in minutes!

Top Computers & Internet Experts

Doctor PC
Doctor PC

Level 3 Expert

7733 Answers

kakima

Level 3 Expert

102366 Answers

David Payne
David Payne

Level 3 Expert

14161 Answers

Are you a Computer and Internet Expert? Answer questions, earn points and help others

Answer questions

Manuals & User Guides

Loading...