...settings, it is a 1985 1600 toyota corolla 4A engine hey, torque must be done in 3 steps: 1st 22 ft lbs 2nd 43 ft lbs final 47 ft lbs use this sequence of tightening: 9 - 3 -1 -6 -8 7 - 5 - 2 -4 - ...
...1.The Drivers side of the engine is the Left side. From the Front going towards the back; the bolts are numbered 10, 6, 1, 3, and 7. From the Front going towards the back on the Passenger side; the ...
I have a Toyota 7-AFE engine and require the correct conrod/piston torque settings Stage 1 25Nm Stage 2 90 degrees
...all the bolts down to about 46 lbs ppt in the right order specified by manufactorer then about another 1/2 -5/8 of a turn for the final tightening Thats about standard throughout engine ...
...the valve stem and then you put oil control clips on so the oil does not spray and you start the engine. You tighten them down till the chattering noise goes away, then back them off 1/8 to 1/4
engine block and blow them out with compressed air. Reassembly 1. After the gasket surfaces are prepared, set the new head gasket in place and CAREFULLY place the head into position, take extreme care
...1/2 mark. Also when climbing a hill or moving from a stationey position it doesnt have enough power and the engine revs to 3000rpm and starts to be jerky. lets start with the heating up problem! ...
Question about Toyota Corolla
...engine 1 i need torque settings for the engine ie head bolts etc i am replacing the heads on a GMC 350 cu in engine. what is the final torque of the head bolts? For 1985 Chevrolet Camaro 5.0L ...
engine are as follows: Step 1: Torque the bolts to 25 Nm (18 lb-ft) using a torque wrench. Step 2: Tighten the bolts an additional 90 degrees (1/4 turn) using a torque angle gauge. Step 3: Tighten the
...Hope this ...
78 questions posted
Usually answered in minutes!
1,231 Questions
1,240 Questions
1,236 Questions
819 Questions
767 Questions