The head bolts are done in 3 stages: first stage is 20 ft.lbs, second stage is 50 ft.lbs and the third stage is an additional 90 degrees or 1/4 turn.This is the sequence.
14 10 6 2 3 7 11 15
17 9 1 8 16
13 5 4 12
The rail above the valve springs must be the rocker arm shaft. The bolts on it are torqued to 40 ft.lbs. The intake is torqued to 31 ft.lbs. Hope this helps.
1,049 views
Usually answered in minutes!
×