Question about 1993 Mazda Protege

Open Question

1993 Mazda Protege 1.8: what is the torque and tightening sequence on head, and how to set rockers again?

Posted by on

6 Suggested Answers

6ya6ya
  • 2 Answers

SOURCE: I have freestanding Series 8 dishwasher. Lately during the filling cycle water hammer is occurring. How can this be resolved

Hi,
a 6ya expert can help you resolve that issue over the phone in a minute or two.
best thing about this new service is that you are never placed on hold and get to talk to real repairmen in the US.
the service is completely free and covers almost anything you can think of (from cars to computers, handyman, and even drones).
click here to download the app (for users in the US for now) and get all the help you need.
goodluck!

Posted on Jan 02, 2017

  • 423 Answers

SOURCE: 2000 Mazda Protege replace belts

Tightening the alternator and the power steering belts on a Mazda is not too hard, but if you need to tighten them, you probably need to replace them too.
I recommend you go to an auto parts store and buy a third party repair manual for the 200 Mazda Protege.  ~$15.00.
It covers changing/tightening belts pretty well.
Good Luck!

Posted on Apr 16, 2009

c17hydro
  • 2984 Answers

SOURCE: fuse box diagram

Hope this helps...let me know and I will get a better one:

081afc9.gif

Posted on Jun 28, 2009

inspectmycar
  • 233 Answers

SOURCE: 94 mazda B3000 3.0L cylinder head torque specs

Step 1 torque to 59 ft pounds
2. Loosen one full turn
3. 37 ft pounds
4. 68 ft pounds

Use torque sequence below
aca9f77.gif

Posted on Sep 17, 2009

  • 14036 Answers

SOURCE: 01 mazda protege camshaft torque specs

CAMSHAFT BEARING CAPS TORQUE TO 125 INCH POUNDS. CAMSHAFT SPROCKETS - 44 FT LBS. YOU NEED A REPAIR MANUAL LIKE A CHILTON WITH CAMSHAFT TORQUE SEQUENCE DIAGRAM. YOU HAVE 20 CAMSHAFT CAP BOLTS THAT HAVE TO BE TORQUE IN SEQUENCE.

Posted on Mar 21, 2010

Testimonial: "Thanks that was very quick and right on he money "

roniecon
  • 6826 Answers

SOURCE: mazda protege no start

Check all engine grounds,and connections,check to make sure there is good connection at the oil sending unit,also,turn the key on,for a 1.5 second,and then off for about the same time,do this about 10 times to prime the fuel lines,and injectors also.Check connectors at cam sensor,and crank sensor,and make sure there is nothing sticking to the cam sensor on the inside,bits of metal or anything.

Posted on Mar 22, 2010

Add Your Answer

Uploading: 0%

my-video-file.mp4

Complete. Click "Add" to insert your video. Add

×

Loading...
Loading...

Related Questions:

1 Answer

Need head bolt torque specs for a 1996 saturn sl


Quote:





Originally Posted by norvelplagbao52

1993 saturn sl2 1.9 dohc cylinder head torque
specs and sequence
Cylinder head bolt
tightening procedure:
CYLINDER HEAD BOLT TIGHTENING SEQUENCE:

INTAKE
SIDE
8 4 1 5 9

7 3 2 6 10
EXHAUST SIDE

In sequence,
torque the cylinder head bolts. Torque: 30 Nm (22 ft-lbs).
In sequence,
torque all bolts. Torque: 50 Nm (37 ft-lbs)
In sequence, turn each bolt an
additional 90 degrees.





Originally Posted by norvelplagbao52

1993 saturn sl2 1.9 dohc cylinder head torque
specs and sequence
Cylinder head bolt
tightening procedure:
CYLINDER HEAD BOLT TIGHTENING SEQUENCE:

INTAKE
SIDE
8 4 1 5 9

7 3 2 6 10
EXHAUST SIDE

In sequence,
torque the cylinder head bolts. Torque: 30 Nm (22 ft-lbs).
In sequence,
torque all bolts. Torque: 50 Nm (37 ft-lbs)
In sequence, turn each bolt an
additional 90 degrees.

Sep 19, 2013 | 1996 Saturn SL

1 Answer

Hello! I have a Mazda MPV v6 3.0 93 I need your help,i remove the heads and i need to reinstall,I need to know: head torque secuence and tighten on bolts. thank you everybody


TORQUE ALL BOLTS PROPER SEQUENCE TO 14 FT LBS.THEN PAINT MARK ON THE OF EACH BOLT.USING MARK AS A REFERENCE TIGHTEN ALL THE BOLTS PROPER SEQUENCE AN ADDITIONAL 90 DEGREES.THEN TIGHTEN ALL BOLTS IN SEQUENCE ADDITIONAL 90 DEGREES. WRITE THIS NUMBER ON A PIECE OF PAPER. 8 4 1 5 AND UNDER THAT NUMBER WRITES THIS NUMBER UNDER THE NUMBER JUST GAVE YOU 7 3 2 6 THIS IS YOUR CYLINDER HEAD BOLT TORQUE SEQUENCE.

May 31, 2011 | 1993 Mazda MPV

1 Answer

Correct pressure for torque the head of mazda pickup 1998


Since you didn't say which engine you have, I've pulled torque specs for 3 different engines. Also, since I can't include a diagram showing the relative locations of the numbered head-bolt locations, it would be a good idea for you to purchase a vehicle specific repair guide that will show this info.


Take particular note about the TTY (Torque to Yield) bolts used on 2 of the 3 engines shown. It is said that new head bolts MUST BE USED when head is replaced or re-installed to obtain the proper torque.



B2500 4 Cylinder

Torque sequence: --------- ' 10 6 2 4 8 ' front ' ' ' 7 3 1 5 9 ' -----------Step 1: torque in sequence to 51 Ft/Lbs Step 2: torque again in sequence to 51 Ft/Lbs Step 3: final tighten all bolts an additional 90 to 100 degrees recheck final torque in sequence *** CAUTION ***engine uses Torque To Yield head bolts (TTY) that permanently stretch during the initial installation. New head bolts must be used when cylinder head is replaced or re-installed to obtain proper torque.







B3000 3.0 6 Cylinder

Torque sequence ---------- ' 6 4 2 8 ' ' ' ' 5 1 3 7 ' ---------- Step 1: torque to 59 Ft/Lbs Step 2: loosen in sequence (1) full turn Step 3: torque to 41 Ft/Lbs Step 4: torque to 73 Ft/Lbs









B4000 4.0 6 Cylinder

Torque sequence --------- ' 5 1 3 7 ' ' ' ' 6 4 2 8 ' --------- Step 1: torque cylinder head bolts in sequence to 26 Ft/Lbs Step 2: torque cylinder head bolts to 56 Ft/Lbs Step 3: turn cylinder head bolts in sequence an additional 90-degrees recheck final torque in sequence *** CAUTION ***engine uses Torque To Yield head bolts (TTY) that permanently stretch during the initial installation. New head bolts must be used when cylinder head is replaced or re-installed to obtain proper torque.


Good luck with this job!

Feb 06, 2011 | 1998 Mazda Pickup

1 Answer

NEED HELP WITH TORQUE SPECS ON 1998 CHEVROLET SURBURBAN CYLINDER HEADS 5.7


Cylinder Head Removal & Installation 5.7L Engine To Remove:
  1. Disconnect the negative battery cable.
  2. Drain the engine coolant.
  3. Remove the air cleaner assembly.
  4. Remove the upper radiator hose.
  5. Remove both heater hoses.
  6. Disconnect spark plug wires at distributor cap.
  7. Remove distributor cap.
  8. Remove the coolant bypass hose from the water pump.
  9. Remove the drive belt. NOTE: It is not necessary to evacuate the A/C refrigerant.
  10. Remove the A/C compressor from the mounting bracket and set it aside.
  11. Remove the wiring bracket from the rear of the cylinder head.
  12. Disconnect the accessory bracket and slide forward.
  13. Remove the upper and lower intake manifold.
  14. Remove the exhaust manifolds.
  15. Remove the valve rocker arms and pushrods.
  16. Remove the power steering pump pulley.
  17. Disconnect the electrical connector from the power steering pump.
  18. Remove nuts attaching the power steering pump to the engine.
  19. Remove power steering pump mounting bracket bolts and nut.
  20. Slide power steering pump/bracket assembly forward and remove stud.
  21. Set power steering pump/bracket assembly aside.
  22. Disconnect the wiring bracket from rear of the right cylinder head.
  23. Remove the generator.
  24. Remove the oil indicator tube bracket bolt.
  25. Remove the generator mounting bracket.
  26. Remove the sixteen cylinder head bolts.
  27. Remove cylinder heads and gaskets.
  28. Clean all sealing surfaces.
To Install:
Right Side NOTE: Clean all dirt, debris, and coolant from the engine block cylinder head bolt holes. Failure to remove all foreign material may result in damaged threads, improperly tightened fasteners or damage to components.
NOTE: Do not use any type of sealant on the cylinder head gasket (unless specified).
  1. Clean the cylinder head bolt holes with a thread chaser and compressed air.
  2. Check the cylinder head locating pins for proper installation.
  3. Place a new cylinder head gasket over the engine block dowel pins.
  4. Install the cylinder head to the engine block.
  5. Apply sealant (GM P/N 12346004 or equivalent) to cylinder head bolt threads.
  6. Install the cylinder head bolts. gm-03-50-685.gif

  7. Tighten the cylinder head bolts in sequence on the first pass.
    • Torque to: 22 ft. lbs. (30 Nm)
  8. Using a torque angle meter, tighten the long bolts (1, 2, 5, 6, 9, 10 and 13) on the second pass in sequence to 75°.
  9. Using a torque angle meter, tighten the medium bolts (14 and 17) on the second pass in sequence to 65°.
  10. Using a torque angle meter, tighten the short bolts (3, 4, 7, 8, 11, 12, 15 and 16) on the second pass in sequence to 55°.
  11. Install the valve rocker arms and pushrods.
  12. Install the generator mounting bracket stud.
    • Torque to: 15 ft. lbs. (20 Nm)
  13. Loosely assemble the generator mounting bracket over the stud.
  14. Install all nuts and bolts finger tight.
    • Torque to: 30 ft. lbs. (41 Nm)
  15. Install the generator.
  16. Install the oil indicator tube bracket bolt.
  17. Install the exhaust manifold.
  18. Install the lower intake manifold.
  19. Install the valve rocker arm covers.
  20. Install the wiring bracket to the rear of the cylinder head.
  21. Connect the accessory bracket.
  22. Install the A/C compressor.
  23. Install the drive belt.
  24. Install the distributor cap.
  25. Connect the spark plug wires to the distributor cap.
  26. Install both heater hoses.
  27. Install the upper radiator hose.
  28. Install the air cleaner assembly.
  29. Refill the engine coolant.
  30. Connect the negative battery cable.
Left Side To Install:
NOTE: Clean all dirt, debris, and coolant from the engine block cylinder head bolt holes. Failure to remove all foreign material may result in damaged threads, improperly tightened fasteners or damage to components.
NOTE: Do not use any type of sealant on the cylinder head gasket (unless specified).
NOTE: Clean all dirt, debris, and coolant from the engine block cylinder head bolt holes. Failure to remove all foreign material may result in damaged threads, improperly tightened fasteners or damage to components.
NOTE: Do not use any type of sealant on the cylinder head gasket (unless specified).
  1. Clean the cylinder head bolt holes with a thread chaser and compressed air.
  2. Check the cylinder head locating pins for proper installation.
  3. Place a new cylinder head gasket over the engine block dowel pins.
  4. Install the cylinder head to the engine block.
  5. Apply sealant (GM P/N 12346004 or equivalent) to cylinder head bolt threads.
  6. Install the cylinder head bolts. gm-03-50-685.gif

  7. Tighten the cylinder head bolts in sequence on the first pass.
    • Torque to: 22 ft. lbs. (30 Nm)
  8. Using a torque angle meter, tighten the long bolts (1, 2, 5, 6, 9, 10 and 13) on the second pass in sequence to 75°.
  9. Using a torque angle meter, tighten the medium bolts (14 and 17) on the second pass in sequence to 65°.
  10. Using a torque angle meter, tighten the short bolts (3, 4, 7, 8, 11, 12, 15 and 16) on the second pass in sequence to 55°.
  11. Install the valve rocker arms and pushrods.
  12. Install the power steering pump mounting bracket stud.
    • Torque to: 15 ft. lbs. (20 Nm)
  13. Loosely assemble the mounting bracket over the stud.
  14. Install all nuts and bolts finger tight.
    • Torque to: 30 ft. lbs. (41 Nm)
  15. Install the power steering pump pulley.
  16. Connect the electrical connector to the power steering pump.
  17. Install the exhaust manifold.
  18. Install the lower intake manifold.
  19. Install the valve rocker arm covers.
  20. Install the wiring bracket to the rear of the cylinder head.
  21. Connect the accessory bracket.
  22. Install the A/C compressor.
  23. Install the drive belt.
  24. Install the distributor cap.
  25. Connect the spark plug wires to the distributor cap.
  26. Install both heater hoses.
  27. Install the upper radiator hose.
  28. Install the air cleaner assembly.
  29. Refill the engine coolant.
  30. Connect the negative battery cable.

Aug 31, 2010 | Chevrolet Suburban 1500 Cars & Trucks

1 Answer

1998 FORD FESTIVA HEAD BOLT TORQUE SETTINGS & TIGHTENING SEQUENCE (1.5 LITRE ENGINE)


1978 - 1980 FORD FESTIVA 1.6L 65-70 Foot pounds (Final torque)
Torque sequence 9 3 1 5 7 8 6 2 4 10 Step 1: torque to 5 Ft/Lbs Step 2: torque to 20-30 Ft/Lbs Step 3: torque to 50-55 Ft/Lbs Step 4: torque to 65-70 Ft/Lbs Recheck final torque in sequence


1988 - 1993 F0RD FESTIVA 1.3L
Torque sequence front of engine 8 4 1 5 9 7 3 2 6 10 Step 1: torque to 35-40 Ft/Lbs Step 2: torque to 56-60 Ft/Lbs Recheck final torque in sequence

2011 FORD FESTIVA 1.6L NO TORQUE SPECS AVAILABLE THERE IS NO FORD FESTIVA MANUFACTURED IN 1998 ALSO NO FORD FESTIVA MANUFACTURED WITH A 1.5L ENGINE
HOPE THIS HELPS YOU

Aug 06, 2010 | Ford Focus Cars & Trucks

2 Answers

What r the torque specifications on installing a head on a 1999 yukon and the tightening sequence


Check this procedure...
  1. Tighten the first design cylinder head bolts as follows:
    1. M11 bolts 1st pass: in sequence to 22 ft. lbs. (30 Nm).
    2. M11 bolts 2nd pass: in sequence + 90 degrees.
    3. M11 bolts (1,2,3,4,5,6,7,8): + 90 degrees.
    4. M11 bolts (9 and 10): + 50 degrees.
    5. M8 cylinder head bolts (11,12,13,14,15) to 22 ft. lbs. (30 Nm). Begin with the center bolt (11) and alternating side-to-side, work outward tightening all of the bolts.
  2. Tighten the second design cylinder head bolts as follows:
    1. M11 bolts (1-10) 1st pass: in sequence to 22 ft. lbs. (30 Nm).
    2. M11 bolts (1-10) 2nd pass: in sequence + 90 degrees.
    3. M11 bolts (1-10): + 70 degrees.
    4. M8 cylinder head bolts (11,12,13,14,15) to 22 ft. lbs. (30 Nm). Begin with the center bolt (11) and alternating side-to-side, work outward tightening all of the bolts.

c409909.jpg

Fig. Cylinder head bolt tightening sequence-4.8L, 5.3L and 6.0L engines (click for zoom)


Install the cylinder head bolts in sequence to 22 ft. lbs. (30 Nm). The bolts must be tightened once, then be tightened again in sequence in the following order:
  1. Step 1: Short length bolt: (3, 4, 7, 8, 11, 12, 15, 16), plus 55 degrees.
  2. Step 2: Medium length bolt: (14, 17), plus 65 degrees.
  3. Step 3: Long length bolts: (1, 2, 5, 6, 9, 10, 13), plus 75 degrees.

7f05cb7.jpg

Fig. Cylinder head bolt tightening sequence-5.0L and 5.7L engines

Aug 04, 2010 | 1999 GMC Yukon Denali

1 Answer

I need torque specs on 93 dodge 360 ..heads, rocker assembly and torque sequence


Cylinder Head Bolt 5.9L

Step 1 - 50 ftlb
Step 2 - 105 ftlb
Step 3 - Recheck At 105 ftlb

Tightening sequence

Rocker Arm Bolt

5.9L - 17 ftlb

Jan 23, 2010 | 1993 Dodge Ramcharger

3 Answers

Torque settings for cylinder head nissan sentra


Tighten in sequence to 29ft.lbs then tighten in sequence to 58ft lbs. then loosen all bolts. Then tighten in sequence to 33ft lbs. then tighten each bolt in sequence 90 degrees then tighten each bolt again 90 degrees

Jul 18, 2009 | 1999 Nissan Sentra

Not finding what you are looking for?
1993 Mazda Protege Logo

Related Topics:

69 people viewed this question

Ask a Question

Usually answered in minutes!

Top Mazda Experts

yadayada
yadayada

Level 3 Expert

75817 Answers

Colin Stickland
Colin Stickland

Level 3 Expert

22156 Answers

Jeff Turcotte
Jeff Turcotte

Level 3 Expert

8180 Answers

Are you a Mazda Expert? Answer questions, earn points and help others

Answer questions

Manuals & User Guides

Loading...