Question about 1994 Chevrolet Caprice Classic

1 Answer

Mid 80's caprice power steering/altenator bracket

What size tourqs head for mounting bracket?

Posted by on

1 Answer

  • Level 2:

    An expert who has achieved level 2 by getting 100 points

    Hot-Shot:

    An expert who has answered 20 questions.

    Corporal:

    An expert that has over 10 points.

    Mayor:

    An expert whose answer got voted for 2 times.

  • Expert
  • 76 Answers

3/4 ALLEN

Posted on Sep 25, 2009

1 Suggested Answer

6ya6ya
  • 2 Answers

SOURCE: I have freestanding Series 8 dishwasher. Lately during the filling cycle water hammer is occurring. How can this be resolved

Hi,
a 6ya expert can help you resolve that issue over the phone in a minute or two.
best thing about this new service is that you are never placed on hold and get to talk to real repairmen in the US.
the service is completely free and covers almost anything you can think of (from cars to computers, handyman, and even drones).
click here to download the app (for users in the US for now) and get all the help you need.
goodluck!

Posted on Jan 02, 2017

Add Your Answer

Uploading: 0%

my-video-file.mp4

Complete. Click "Add" to insert your video. Add

×

Loading...
Loading...

Related Questions:

1 Answer

I need a power steering mounting diagram for a 1981 chevy caprice


The pump will bolt to the bracket, then you will have two bracket bolts to the water pump and another bracket bolt to a bracket attached to one of the exhaust manifold bolts.

Dec 04, 2015 | Cars & Trucks

2 Answers

How does one adjust the tension on the serpentine belt when the vehicle does not have an automatic adjustment?


Find tensioner pulley loosen nut on pulley turn adjusting bolt at the back of pulley , re-tighten pulley nut.

Feb 28, 2011 | 2000 Chevrolet Tracker

1 Answer

NEED HELP WITH TORQUE SPECS ON 1998 CHEVROLET SURBURBAN CYLINDER HEADS 5.7


Cylinder Head Removal & Installation 5.7L Engine To Remove:
  1. Disconnect the negative battery cable.
  2. Drain the engine coolant.
  3. Remove the air cleaner assembly.
  4. Remove the upper radiator hose.
  5. Remove both heater hoses.
  6. Disconnect spark plug wires at distributor cap.
  7. Remove distributor cap.
  8. Remove the coolant bypass hose from the water pump.
  9. Remove the drive belt. NOTE: It is not necessary to evacuate the A/C refrigerant.
  10. Remove the A/C compressor from the mounting bracket and set it aside.
  11. Remove the wiring bracket from the rear of the cylinder head.
  12. Disconnect the accessory bracket and slide forward.
  13. Remove the upper and lower intake manifold.
  14. Remove the exhaust manifolds.
  15. Remove the valve rocker arms and pushrods.
  16. Remove the power steering pump pulley.
  17. Disconnect the electrical connector from the power steering pump.
  18. Remove nuts attaching the power steering pump to the engine.
  19. Remove power steering pump mounting bracket bolts and nut.
  20. Slide power steering pump/bracket assembly forward and remove stud.
  21. Set power steering pump/bracket assembly aside.
  22. Disconnect the wiring bracket from rear of the right cylinder head.
  23. Remove the generator.
  24. Remove the oil indicator tube bracket bolt.
  25. Remove the generator mounting bracket.
  26. Remove the sixteen cylinder head bolts.
  27. Remove cylinder heads and gaskets.
  28. Clean all sealing surfaces.
To Install:
Right Side NOTE: Clean all dirt, debris, and coolant from the engine block cylinder head bolt holes. Failure to remove all foreign material may result in damaged threads, improperly tightened fasteners or damage to components.
NOTE: Do not use any type of sealant on the cylinder head gasket (unless specified).
  1. Clean the cylinder head bolt holes with a thread chaser and compressed air.
  2. Check the cylinder head locating pins for proper installation.
  3. Place a new cylinder head gasket over the engine block dowel pins.
  4. Install the cylinder head to the engine block.
  5. Apply sealant (GM P/N 12346004 or equivalent) to cylinder head bolt threads.
  6. Install the cylinder head bolts. gm-03-50-685.gif

  7. Tighten the cylinder head bolts in sequence on the first pass.
    • Torque to: 22 ft. lbs. (30 Nm)
  8. Using a torque angle meter, tighten the long bolts (1, 2, 5, 6, 9, 10 and 13) on the second pass in sequence to 75°.
  9. Using a torque angle meter, tighten the medium bolts (14 and 17) on the second pass in sequence to 65°.
  10. Using a torque angle meter, tighten the short bolts (3, 4, 7, 8, 11, 12, 15 and 16) on the second pass in sequence to 55°.
  11. Install the valve rocker arms and pushrods.
  12. Install the generator mounting bracket stud.
    • Torque to: 15 ft. lbs. (20 Nm)
  13. Loosely assemble the generator mounting bracket over the stud.
  14. Install all nuts and bolts finger tight.
    • Torque to: 30 ft. lbs. (41 Nm)
  15. Install the generator.
  16. Install the oil indicator tube bracket bolt.
  17. Install the exhaust manifold.
  18. Install the lower intake manifold.
  19. Install the valve rocker arm covers.
  20. Install the wiring bracket to the rear of the cylinder head.
  21. Connect the accessory bracket.
  22. Install the A/C compressor.
  23. Install the drive belt.
  24. Install the distributor cap.
  25. Connect the spark plug wires to the distributor cap.
  26. Install both heater hoses.
  27. Install the upper radiator hose.
  28. Install the air cleaner assembly.
  29. Refill the engine coolant.
  30. Connect the negative battery cable.
Left Side To Install:
NOTE: Clean all dirt, debris, and coolant from the engine block cylinder head bolt holes. Failure to remove all foreign material may result in damaged threads, improperly tightened fasteners or damage to components.
NOTE: Do not use any type of sealant on the cylinder head gasket (unless specified).
NOTE: Clean all dirt, debris, and coolant from the engine block cylinder head bolt holes. Failure to remove all foreign material may result in damaged threads, improperly tightened fasteners or damage to components.
NOTE: Do not use any type of sealant on the cylinder head gasket (unless specified).
  1. Clean the cylinder head bolt holes with a thread chaser and compressed air.
  2. Check the cylinder head locating pins for proper installation.
  3. Place a new cylinder head gasket over the engine block dowel pins.
  4. Install the cylinder head to the engine block.
  5. Apply sealant (GM P/N 12346004 or equivalent) to cylinder head bolt threads.
  6. Install the cylinder head bolts. gm-03-50-685.gif

  7. Tighten the cylinder head bolts in sequence on the first pass.
    • Torque to: 22 ft. lbs. (30 Nm)
  8. Using a torque angle meter, tighten the long bolts (1, 2, 5, 6, 9, 10 and 13) on the second pass in sequence to 75°.
  9. Using a torque angle meter, tighten the medium bolts (14 and 17) on the second pass in sequence to 65°.
  10. Using a torque angle meter, tighten the short bolts (3, 4, 7, 8, 11, 12, 15 and 16) on the second pass in sequence to 55°.
  11. Install the valve rocker arms and pushrods.
  12. Install the power steering pump mounting bracket stud.
    • Torque to: 15 ft. lbs. (20 Nm)
  13. Loosely assemble the mounting bracket over the stud.
  14. Install all nuts and bolts finger tight.
    • Torque to: 30 ft. lbs. (41 Nm)
  15. Install the power steering pump pulley.
  16. Connect the electrical connector to the power steering pump.
  17. Install the exhaust manifold.
  18. Install the lower intake manifold.
  19. Install the valve rocker arm covers.
  20. Install the wiring bracket to the rear of the cylinder head.
  21. Connect the accessory bracket.
  22. Install the A/C compressor.
  23. Install the drive belt.
  24. Install the distributor cap.
  25. Connect the spark plug wires to the distributor cap.
  26. Install both heater hoses.
  27. Install the upper radiator hose.
  28. Install the air cleaner assembly.
  29. Refill the engine coolant.
  30. Connect the negative battery cable.

Aug 31, 2010 | Chevrolet Suburban 1500 Cars & Trucks

2 Answers

What r the torque specifications on installing a head on a 1999 yukon and the tightening sequence


Check this procedure...
  1. Tighten the first design cylinder head bolts as follows:
    1. M11 bolts 1st pass: in sequence to 22 ft. lbs. (30 Nm).
    2. M11 bolts 2nd pass: in sequence + 90 degrees.
    3. M11 bolts (1,2,3,4,5,6,7,8): + 90 degrees.
    4. M11 bolts (9 and 10): + 50 degrees.
    5. M8 cylinder head bolts (11,12,13,14,15) to 22 ft. lbs. (30 Nm). Begin with the center bolt (11) and alternating side-to-side, work outward tightening all of the bolts.
  2. Tighten the second design cylinder head bolts as follows:
    1. M11 bolts (1-10) 1st pass: in sequence to 22 ft. lbs. (30 Nm).
    2. M11 bolts (1-10) 2nd pass: in sequence + 90 degrees.
    3. M11 bolts (1-10): + 70 degrees.
    4. M8 cylinder head bolts (11,12,13,14,15) to 22 ft. lbs. (30 Nm). Begin with the center bolt (11) and alternating side-to-side, work outward tightening all of the bolts.

c409909.jpg

Fig. Cylinder head bolt tightening sequence-4.8L, 5.3L and 6.0L engines (click for zoom)


Install the cylinder head bolts in sequence to 22 ft. lbs. (30 Nm). The bolts must be tightened once, then be tightened again in sequence in the following order:
  1. Step 1: Short length bolt: (3, 4, 7, 8, 11, 12, 15, 16), plus 55 degrees.
  2. Step 2: Medium length bolt: (14, 17), plus 65 degrees.
  3. Step 3: Long length bolts: (1, 2, 5, 6, 9, 10, 13), plus 75 degrees.

7f05cb7.jpg

Fig. Cylinder head bolt tightening sequence-5.0L and 5.7L engines

Aug 04, 2010 | 1999 GMC Yukon Denali

1 Answer

Trying to change the altenator on the car it won't stay idled up when i come to a complete stop and the battery keeps going dead


  1. Remove the power steering pump and cruise control actuator.
NOTE: Do not disconnect the actuator cable.
  1. Disconnect the alternator connector from the alternator.
Removing WHT / RED Wire From B Terminal 42171248


  1. Remove the terminal nut and the WHT / RED wire from the B terminal.
  2. Loosen the adjusting bolt, then remove the through bolt nut.
  3. Remove the alternator belt from the alternator pulley.
Removing Alternator 42171249


  1. Remove the adjusting bolt, the adjustment-lock bolt, and the adjusting nut.
  2. Remove the mounting bolt, then remove the alternator.
Mounting Bracket Removal 42171250


  1. If necessary, remove the four mounting bracket bolts, mount bracket, and heat insulator.
  2. Install in reverse order of removal, and adjust the alternator belt tension.

Jun 17, 2010 | 1992 Honda Accord

1 Answer

Cylinder head removal on 2005 nissan altima 2.5 engine would like to know how to remove the camshaft to remove the head bolts


CYLINDER HEAD REMOVAL

2.5L Engines
  1. Before servicing the vehicle, refer to the Precautions Section.
  2. Drain cooling system and engine oil.
  3. Relieve the fuel system pressure.
  4. Remove or disconnect the following:
    • Negative battery cable
    • Upper radiator hose and heater hose
    • Right side fuse/relay box and move aside
    • Engine undercover
    • Resonator and air cleaner case
    • Engine top cover
    • All electrical and vacuum lines at the head
    • Fuse hose quick connector at fuel tube side
    • Engine harness and power steering hose bracket
    • Timing chain
    • Drive belt tensioner
    • Camshafts
    • Spark plugs
    • Exhaust manifold
  5. Support the engine from above and below with a suitable jack and hoist.
  6. Remove or disconnect the following:
    • Power steering pump and reservoir and wire aside
    • Auxiliary drive belts
    • A/C compressor and wire aside
    • Upper sway bar links
    • Front and rear engine mount through bolts
    • Lower ball joints
    • 2 steering gear housing mounting bolts
    • Front suspension member bolts and front suspension member
  7. Loosen the cylinder head bolts in the sequence shown and remove the cylinder head.
d365038.gif
Removing the front suspension member—Altima

7555308.gif
Cylinder head bolt removal sequence—2.5L engine–Altima and Sentra

1e6ce81.gif
Cylinder head bolt tightening sequence—2.5L engine–Altima and Sentra

To install:
  1. Clean the gasket surfaces.
  2. Using new head gaskets, install the cylinder heads.
    NOTE If possible, replacement of the head bolts is suggested.

  3. If replacement of the head bolts is not possible, perform the following bolt measurement:
    • Measure the diameter of the head bolt 0.43 in. (11mm) from the bottom of the bolt.
    • Measure the diameter of the head bolt 2.17 in. (55mm) from the bottom of the bolt.
    • Whenever the size difference between the 2 measurements exceeds 0.0091 in. (0.23mm) the head bolts must be replaced.
  4. Apply clean engine oil to the bolt threads and seating surfaces and tighten the cylinder head bolts in sequence as follows:
    • Step 1: 72 ft. lbs. (98 Nm).
    • Step 2: Loosen all the bolts completely.
    • Step 2: 29 ft. lbs. (33 Nm).
    • Step 4: Plus 75–80 degrees clockwise.
    • Step 5: Plus 75–80 degrees clockwise.
  5. Install the front suspension member and tighten the bolts to the specifications shown in the illustration.
  6. Install or connect the following:
    • 2 steering gear housing mounting bolts
    • Lower ball joints
    • Front and rear engine mount through bolts
    • Upper sway bar links
    • A/C compressor
    • Auxiliary drive belts
    • Power steering pump and reservoir
    • Exhaust manifold
    • Spark plugs
    • Camshafts
    • Drive belt tensioner
    • Timing chain
    • Engine harness and power steering hose bracket
    • Fuse hose quick connector at fuel tube side
    • All electrical and vacuum lines at the head
    • Engine top cover
    • Resonator and air cleaner case
    • Engine undercover
    • Right side fuse/relay box and move aside
    • Upper radiator hose and heater hose
    • Negative battery cable
  7. Fill the cooling system and engine oil
  8. Start the vehicle, check for leaks and repair if necessary.

Nov 13, 2009 | 2005 Nissan Altima

1 Answer

How do you replace the alternator on a 2000ford contour



Removal & Installation

2.0L Engine
  1. Disconnect the negative battery cable.
  2. Remove air intake resonators.
  3. Remove the air cleaner-to-throttle body tube and the mass airflow sensor.
  4. Unplug the connectors and remove the cables from the alternator.
  5. Raise and support the vehicle.
  6. Release the drive belt tensioner and remove the drive belt from around the alternator.
    NOTE It is not necessary to remove the drive belt from the engine.
  7. Remove the alternator mounting bracket bolts and remove the mounting bracket.
  8. Lower the vehicle.
  9. Remove the power steering pressure hose bracket retaining nut and bolt and remove the bracket with the hose from the engine lifting eye.
  10. Remove the alternator mounting bolts and remove the alternator from the vehicle.
  11. To install:
    1. Place the alternator into position and install the mounting bolts finger tight.
    2. Install the power steering hose bracket and tighten the retaining nut and bolt to 70-106 inch lbs. (8-12 Nm).
    3. Raise and support the vehicle.
    4. Install the alternator mounting bracket and retaining bolts and tighten to 15-22 ft. lbs. (20-30 Nm).
    5. Release the drive belt tensioner and install the drive belt pulley over the alternator pulley.
    6. Lower the vehicle.
    7. Tighten the alternator mounting bolts to 15-22 ft. lbs. (20-30 Nm).
    8. Install the alternator connectors and the cables. Tighten the terminal nut to 80-97 inch lbs. (9-11 Nm).
    9. Install the air cleaner-to-throttle body tube, mass airflow sensor, and the air intake resonators.
    10. Connect the negative battery cable. To install:
      1. Place the alternator into position and install the mounting bolts finger tight.
      2. Install the power steering hose bracket and tighten the retaining nut and bolt to 70-106 inch lbs. (8-12 Nm).
      3. Raise and support the vehicle.
      4. Install the alternator mounting bracket and retaining bolts and tighten to 15-22 ft. lbs. (20-30 Nm).
      5. Release the drive belt tensioner and install the drive belt pulley over the alternator pulley.
      6. Lower the vehicle.
      7. Tighten the alternator mounting bolts to 15-22 ft. lbs. (20-30 Nm).
      8. Install the alternator connectors and the cables. Tighten the terminal nut to 80-97 inch lbs. (9-11 Nm).
      9. Install the air cleaner-to-throttle body tube, mass airflow sensor, and the air intake resonators.
      10. Connect the negative battery cable.


Sep 28, 2009 | 2000 Ford Contour

1 Answer

Remove ignition tumbler


lock cylinder removal

Section 11-04: Steering Column 1996 Escort, Tracer Workshop Manual
REMOVAL AND INSTALLATION Ignition Switch Lock Cylinder Removal
  1. stf~us~en~file=ani_caut.gif~gen~ref.gif WARNING: THE ELECTRICAL CIRCUIT NECESSARY FOR DRIVER SIDE AIR BAG MODULE DEPLOYMENT IS POWERED DIRECTLY FROM THE BATTERY. TO AVOID ACCIDENTAL DEPLOYMENT AND POSSIBLE PERSONAL INJURY, THE BATTERY GROUND CABLE MUST BE DISCONNECTED PRIOR TO SERVICING OR REPLACING ANY DRIVER SIDE AIR BAG MODULE SYSTEM COMPONENTS.
    Remove the steering wheel (3600). Refer to the procedure in this section.
  1. Remove the multi-function switch (13K359). Refer to Section 11-05 for the removal procedure.
  1. Disconnect the ignition switch electrical connector.
  1. Remove the ignition/shifter interlock cable mounting bracket bolt and position the ignition/shifter interlock cable mounting bracket and the ignition/shifter interlock cable (3F719) aside.




  1. Remove the four steering column upper mounting bracket bolts and lower the steering column (3C529).
  1. Use a hammer and chisel to make a groove in the head of each of the two ignition switch lock cylinder bracket bolts.


    0764353.gif

  1. Remove the two ignition switch lock cylinder bracket bolts with a screwdriver and discard the bolts.




  1. Remove the ignition switch lock cylinder and the ignition switch lock cylinder bracket.
Installation
  1. Position the ignition switch lock cylinder and bracket and install two new bolts, tightening them only enough to hold the ignition switch lock cylinder in position.
  1. With the key in the ignition, verify the operation of the ignition switch lock cylinder. If necessary, reposition the ignition switch lock cylinder until it operates properly.
  1. Tighten the ignition switch lock cylinder bracket bolts until the bolt heads break off.
  1. Position the steering column and install the four steering column upper mounting bracket bolts. Tighten the steering column upper mounting bracket bolts to 9-14 Nm (80-124 lb-in).
  1. On vehicles equipped with tilt column, remove the upper mounting bracket retaining pin.
  1. Position the ignition/shifter interlock cable mounting bracket and install the bolt. Tighten the ignition/shifter interlock cable mounting bracket bolt to 4-6 Nm (35-53 lb-in).
  1. Connect the ignition switch electrical connector.
  1. Install the multi-function switch. Refer to Section 11-05 for the installation procedure.
  1. Install the steering wheel. Refer to the procedure in this section.
  1. Inspect the shift interlock system. Refer to Section 07-05 for the procedure.

Apr 07, 2009 | 1995 Mercury Tracer

2 Answers

Replace alternator


This is for both size engines since you didn't list the motor size......


REMOVAL & INSTALLATION 2.0L Engine
  1. Disconnect the negative battery cable.
  2. Remove air intake resonators.
  3. Remove the air cleaner-to-throttle body tube and the mass airflow sensor.
  4. Unplug the connectors and remove the cables from the alternator.
  5. Raise and support the vehicle.
  6. Release the drive belt tensioner and remove the drive belt from around the alternator. NOTE: It is not necessary to remove the drive belt from the engine.
  7. Remove the alternator mounting bracket bolts and remove the mounting bracket.
  8. Lower the vehicle.
  9. Remove the power steering pressure hose bracket retaining nut and bolt and remove the bracket with the hose from the engine lifting eye.
  10. Remove the alternator mounting bolts and remove the alternator from the vehicle. To install:
  11. Place the alternator into position and install the mounting bolts finger tight.
  12. Install the power steering hose bracket and tighten the retaining nut and bolt to 70–106 inch lbs. (8–12 Nm).
  13. Raise and support the vehicle.
  14. Install the alternator mounting bracket and retaining bolts and tighten to 15–22 ft. lbs. (20–30 Nm).
  15. Release the drive belt tensioner and install the drive belt pulley over the alternator pulley.
  16. Lower the vehicle.
  17. Tighten the alternator mounting bolts to 15–22 ft. lbs. (20–30 Nm).
  18. Install the alternator connectors and the cables. Tighten the terminal nut to 80–97 inch lbs. (9–11 Nm).
  19. Install the air cleaner-to-throttle body tube, mass airflow sensor, and the air intake resonators.
  20. Connect the negative battery cable.

Apr 01, 2009 | 1999 Mercury Mystique

Not finding what you are looking for?
1994 Chevrolet Caprice Classic Logo

Related Topics:

109 people viewed this question

Ask a Question

Usually answered in minutes!

Top Chevrolet Experts

yadayada
yadayada

Level 3 Expert

74945 Answers

Colin Stickland
Colin Stickland

Level 3 Expert

22095 Answers

Jeff Turcotte
Jeff Turcotte

Level 3 Expert

7697 Answers

Are you a Chevrolet Expert? Answer questions, earn points and help others

Answer questions

Manuals & User Guides

Loading...