Question about Chevrolet Silverado 1500

Open Question

Bolt pattern for 1997 Chevrolet 5.7 upper intake

Posted by Anonymous on

Ad

6 Suggested Answers

6ya6ya
  • 2 Answers

SOURCE: I have freestanding Series 8 dishwasher. Lately during the filling cycle water hammer is occurring. How can this be resolved

Hi,
a 6ya expert can help you resolve that issue over the phone in a minute or two.
Best thing about this new service is that you are never placed on hold and get to talk to real repairmen in the US.
the service is completely free and covers almost anything you can think of.(from cars to computers, handyman, and even drones)
click here to download the app (for users in the US for now) and get all the help you need.
Goodluck!

Posted on Jan 02, 2017

Ad
rockitman187
  • 2559 Answers

SOURCE: What is the bolt pattern on a 1989 Chevrolet Camaro RS V8?

Stock Wheel size 15 X 7
Bolt pattern 5 X 120.7
Offset = 0

Please rate this a fixya

Posted on Feb 07, 2009

Ad
  • 62 Answers

SOURCE: How do you seperate upper intake manifold from injector assembly

There is a o-ring around the injector assembly,it is probably stuck to the upper plenum.Try gently prying on both sides of upper plenum at same time.

Posted on Aug 06, 2009

SOURCE: 2002 Mercedes Benz S600 Torque on Upper Intake

That is the intake manifold and there are 3 stages for it , I will list for you the 3 stages :
1st stage M6 Nm 8 M8 Nm 20
2nd stage M6 Nm 8
3rd stage M6 90 degree
Hope it helps

Posted on Aug 15, 2009

  • 134 Answers

SOURCE: drilled hole in intake manifold at upper radiator outlet

Did the bolt break off flush with the top of the hole? or if you remove the cover is some bolt sticking up? if there is try and use vice grips to get ahold if the bolts if it is flush then drill the bolt out and re-tap the hole. Way cheaper and likely less work too...

Posted on Nov 02, 2009

  • 335 Answers

SOURCE: cylinder head bolt torque chevrolet 3.4

here is the troque spec for the cylinder heads.

Cylinder Head Bolt

  • First Pass
60 N·m
44 lb ft
  • Final Pass
95 degrees
Cylinder Head Bolt
  • First Pass
60 N·m
44 lb ft
  • Final Pass
95 degrees


Cylinder Head Bolt
  • First Pass
60 N·m
44 lb ft
  • Final Pass
95 degrees
first pass 44 ftlbs
second pass 95 degrees

Posted on Jun 19, 2010

Add Your Answer

Uploading: 0%

my-video-file.mp4

Complete. Click "Add" to insert your video. Add

×

Loading...
Loading...

Related Questions:

1 Answer

What do the intake manifold bolts for a 2002 Chevy Malibu with a 3.1L need to be torqued to?


Pretend the picture is lower intake manifold, that is the tightening sequence.
1st step 5 ft lbs
2nd step bolts 1--4 9.6 ft lbs
3rd step bolts 5--8 18 ft lbs
The upper intake manifold use about the same sequence tighten to 18 ft lbs.
If you don't like ft lbs use inch lbs.
If the upper intake manifold is plastic, be careful with that.
intake manifold-glquxvjrls3o0ta25lrevmb0-4-0.jpg

Apr 17, 2017 | Chevrolet Malibu Cars & Trucks

1 Answer

Cant find my reverce 1997 caviler


Check your owners manual for the correct shift pastern...It is a natural H pattern, with 5th gear upper right...reverse should be all the way to the right and lower right to engage...the knob does not always indicate the correct pattern...may have been changed...also be sure it is a 5 speed...most of these Cavaliers were 4 speeds...with reverse being upper right instead of 5th gear upper right...confirm in your owners manual if possible...will show illustration...Hope this helps.

Jun 18, 2015 | 1997 Chevrolet Cavalier

1 Answer

Pattern for tighten intake manifold bolts on a 04 Chrysler pacifica


INSTALLATION - UPPER INTAKE MANIFOLD
1)Clean and inspect gasket sealing surfaces.
2)Position new gasket.
3)Install the throttle body on the upper intake (if required).
4)Install upper intake manifold and hand start all attaching bolts.
5)Tighten bolts gradually starting in the center working outward until a torque of 12 Nm (105 inch lbs.) is obtained.
6)Install the front and rear intake manifold support brackets.
7)Install the oil level indicator and oil fill tube to intake manifold bolts (Fig. 155).
8)Install the EGR tube.
9)Connect vacuum lines to the following (Fig. 156):
Positive Crankcase Ventilation (PCV) Valve
EVAP Purge Solenoid
Power Brake Booster
10)Install alternator support bracket (Fig. 156).
11)Connect electrical connectors to the following (Fig. 157):
Manifold Tuning Valve (MTV)
Exhaust Gas Recirculation (EGR)
Throttle Position Sensor (TPS)
Idle Air Control (IAC)
Manifold Absolute Pressure (MAP)
12)Install the throttle and speed control cable bracket and retaining bolts.
13)Install throttle and speed control cables to bracket and throttle arm.
14)Install air cleaner housing and inlet hose.
15)Install the engine cover.
16)Connect negative battery cable.

May 30, 2015 | 2004 Chrysler Pacifica

1 Answer

Torque sequence 3400 engine upper intake


starting at the middle bolt and go directly across then criss cross the pattern like you would tightening wheel nuts, towards the outside(end) bolts. if this is a plastic upper intake the torque should be around 15ft lbs if its metal around 25ft lbs.

Sep 04, 2014 | Chevrolet Venture Cars & Trucks

1 Answer

Where is the upper intake manifold located on a 1997 Chevy 2500 van?


The upper part of the intake manifold is the plastic part of the assembly, it's held on with small 10 millimeter headed bolts. NOTE: This dosen't have to be removed to replace the lower intake gaskets.

Mar 11, 2011 | 1997 Chevrolet C/K 2500

1 Answer

Diagram on how to remove and install a spider fuel injector core on a 1994 chevy blazer s10


Here is the removal procedure, and the procedure is the same for both the V-6 and the V-8 Vortec engines. Also, be certain to put engine oil on the "o"-ring seal for the fuel injector assembly before installing the upper intake. Let me know if you require any further assistance.

REMOVAL:

1. Disconnect the battery negative cable assembly from the battery negative terminal.

2. Remove the air cleaner assembly.

3. Remove the wiring harness connectors and the brackets and move aside.

4. Remove the throttle cable and the bracket from the upper intake manifold.

5. Remove the cruise control cable, (if equipped).

6. Remove the fuel lines from the intake to the rear of the block.

7. Remove the ignition coil and the bracket.

8. Remove the upper intake manifold.

INSTALLATION:

1. Install the upper intake manifold gasket.

2. Install the upper intake manifold. Use care not to pinch the injector lines between the upper and lower intake manifolds.

3. Install the upper intake manifold bolts. Note the marks made at disassembly for proper stud location. Install the two corner studs first in order to help align the two halves. NOTE: Other than the two torque passes listed below, the OE Manufacturer did NOT address or supply a bolt tightening sequence for the upper Intake Manifold for this model year, or other model years where this 2 piece manifold setup is used. A "Play It Safe" final tightening sequence would be to tighten from the center most bolts to the outer most bolts.

4. Tighten the bolts in two steps: a. Tighten the bolts on the first sequence to 5 Nm (44 inch lbs.). b. Tighten the bolts on the final sequence to 10 Nm (88 inch lbs.).

5. Install the purge solenoid and bracket.

6. Install the ignition coil and bracket.

7. Install the PCV hose et the upper intake manifold.

8. Install the fuel lines from the intake at the rear of the block.

9. Install the cruise control cable (if equipped).

10. Install the throttle cable and bracket from the upper intake manifold.

11. Install the wiring harness connectors and brackets.

12. Install the air cleaner assembly.

13. Connect the battery negative cable assembly to the battery negative terminal. - Tighten the bolt to 15 Nm (11 ft. lbs.).


2640099.jpg

8a054ef.jpg

Oct 22, 2010 | Chevrolet Blazer Cars & Trucks

1 Answer

Where is thermostate located on 1997 suburban


Follow upper radiator hose from top of radiator to engine. It attaches to thermostat/water outlet housing. Remove hose clamp. Remove two bolts beneath hose that attach housing to intake manifold. Under this housing is your thermostat.

Sep 30, 2010 | 1997 Chevrolet Suburban

1 Answer

Intake manifold gasket replacement? radiator has a


nah its pretty simple for the upper intake. 10 to 12 bolts.

Oct 09, 2009 | 1997 Chevrolet Blazer

4 Answers

Engine Bolt Torques- 2005 Chevy Impala/3400 Engine


Head Bolts
Step one 37 ft lbs then tignten 120 degrees more

Rocker arms
Step one 11 ft lbs then tighten 90 degresss more

Upper intake
89 inch lbs
Lower intake
132 inch lbs

Jun 28, 2008 | 2005 Chevrolet Impala

Not finding what you are looking for?
Cars & Trucks Logo

Related Topics:

25 people viewed this question

Ask a Question

Usually answered in minutes!

Top Chevrolet Experts

yadayada
yadayada

Level 3 Expert

76846 Answers

Colin Stickland
Colin Stickland

Level 3 Expert

22246 Answers

Ronny Bennett Sr.
Ronny Bennett Sr.

Level 3 Expert

6927 Answers

Are you a Chevrolet Expert? Answer questions, earn points and help others

Answer questions

Manuals & User Guides

Loading...