Step 1. drain cooling system.
step 2. remove battery and battery tray.
step 3. remove drive belt.
step 4. remove water pump bolts ( 318 ).
step 5. remove water pump ( 300 ) and water pump gasket ( 314 ).discard gasket.
step 6. inspect and clean gasket mating serface.
step 7. install new water pump and gasket and tighten bolts to 89 in. lbs.
step 8. install drive belt.
step 9. install battery tray and battery.
step 10. fill cooling system.
Book time is 1.5 hours ( this one is what we call a gravy run ) good luck
320 views
Usually answered in minutes!
×